Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Lg-2 Underground PowerhouseBy M. Rancourt, J. Levay, D. K. Murphy
INTRODUCTION The LG-2 project is one element of the La Grande Complex, an integrated development of hydro-electric potential being constructed in north-western Quebec by the James Bay Energy Corpor
Jan 1, 1976
-
Bioremediation MethodsBy Gh. Crutu
During exploration and exploitation of complex ores, waste dumps that contaminate severely the environment and in particular soils and waters, are genetated. The most hazardous pollutants are heavy me
Jan 1, 2008
-
Design Of Embankments For Tailings Ponds And Waste Dumps ? IntroductionBy William E. Mead
Although this paper has been entitled "Design of Embankments for Tailings Ponds and Waste Dumps," a better title might have been "Site Selection and Design Planning for Tailings Ponds and Waste Dumps,
Jan 1, 1967
-
Laboratory Study Of An Organic Binder For Pelletization Of A Magnetite ConcentrateBy S. L. de Moraes
This study aimed to identify a way to reduce the use of bentonite in the pelletization of magnetite. With this goal, different combinations of binders were compared to bentonite by examining the quali
Jan 1, 2010
-
Technical Note - US Department Of Energy's Vision 21 Program - Clean Energy Plants For The 21st CenturyBy L. A. Ruth
Introduction The US Department of Energy's Office of Fossil Energy has begun a new approach for developing the ultra-clean energy plants. This approach will allow the nation to continue to use l
Jan 1, 2003
-
Industrial Mineral Opportunities In British Columbia And Alberta, CanadaBy W. N. Hamilton
British Columbia is geologically favourable for a rich variety of industrial mineral occurrences. Some have been produced for years, others overlooked until recently. Major production occurs for asbes
Jan 1, 1987
-
The Performance Of An Industrial Balling Circuit I - Effect Of Operating Variables On The Mass Flow Rates And Pellet SizeThis paper presents the results of an investigation of the stability of the mass flow rates and average pellet size in the different streams of an industrial-scale balling circuit. The variables in th
Jan 1, 1980
-
Superconducting Magnetic Separators In Mineral ProcessingBy F. S. Knoll
Magnetic separation employing superconducting technology is now accepted within the Kaolin processing industry, proving the value of this technology and its ability to operate reliably even at the mos
Jan 1, 1997
-
A Precipitation‑Adsorption Technique for the Removal of Fluoride and Phosphate in Phosphogypsum: an Economical and Green MethodBy Zibo An, Yong Hu, Hao Zhang, Hong Cao, Jun Xue, Zhen Luo
Phosphogypsum (PG) is a by-product of solid waste produced by the phosphate chemical industry. Owing to large emissions and massive storage issues, it causes a potential threat to our environment. Her
Aug 29, 2022
-
Recovery of valuable metals from copper slag "Mining, Metallurgy & Exploration (2020)"By XUEWEN WANG, Changda Zhang, Huaguang Wang, Mingyu Wang, Bin Hu
The copper smelting process produces plenty of copper slag every year, which is a hazardous solid waste, but a secondary resource. In the present study, the extraction of copper, nickel, and cobalt fr
May 4, 2020
-
Are You In Step With The Eighties?By William L. Carter
Through your presence here this morning and your membership in the Society of Mining Engineers, you have shown that you are interested in keeping abreast of the latest technology and mining procedures
Jan 1, 1981
-
Tailings Line Design As Affected By pHBy A. A. Wallach
During the early design stages of the San Manuel Concentrator, numerous questions were raised concerning the required slope for tailings pipelines. The tailings disposal area which had been selected w
Jan 1, 1958
-
Extended Advance Of Continuous Miner Successfully Ventilated With A Scrubber In A Blowing SectionUnderground testing was carried out by Ingersoll-Rand, Inc., under contract to the Bureau of Mines to determine the effectiveness of a machine-mounted scrubber system for ventilating the face during a
Jan 1, 1986
-
Reducing Blasting Damage By Expanding Delay Timing ? IntroductionBy R. D. Rein
The Henderson mine is a large continuous panel caving operation in central Colorado. The orebody is roughly 760 m by 910 m and will be extracted from two production levels. Each level is divided into
Jan 1, 1985
-
Selective Removal of Mercury Using Zinc Sul?deBy K. L. Gabby
Selective removal of mercury from cyanide leaching solutions while retaining silver has been a long-standing problem, due to the chemical similarity of mercury and silver. In order to be practical, a
-
Kinetics Of Dissolution Of Mardin-Mazidagi (Turkey) Phosphate Ore In Dilute Phosphoric Acid SolutionsBy M. Sinirkaya
The dissolution process of phosphate rock from the Semikan area (Mardin-Mazidagi, Turkey) using dilute phosphoric acid has been investigated. The work involved studying the effect of important variabl
Jan 1, 2010
-
Concentrating PGM from a PGM-Containing Ferroalloy by a Roast-Leach Process - Mining, Metallurgy & Exploration (2021)By Yaxiong Wang, Yong Li, Yuedong Wu, Haigang Dong, Jiachun Zhao
A roasting-leaching process has been developed for concentrating platinum group metals (PGM) from a PGM-containing ferroalloy. The optimized roasting conditions used a NaOH-to-ferroalloy mass ratio of
Jun 14, 2021
-
Safety Considerations For Transport Of Ore And Waste In Underground Ore Passes (80e7f24c-6a48-4528-9532-124b5d3df15f)By B. Stewart
Recent ore pass failures have underlined the need for improved designs, standards, structural monitoring methods, and better hang up prevention and removal techniques. Researchers at the Spokane Resea
Jan 1, 1998
-
Mineral Liberation Analysis: Theoretical Study And Computer SimulationBy G. Barbery
In Mineral Processing, the objective of most processes is the separation of mixtures of minerals, which are originally associated in composite particles. Feed preparation processes grinding for instan
Jan 1, 1977
-
Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel
With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co
Dec 1, 2022