Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Josh Calnan, Paul M. Holmgren, Abigail N. Styer

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

    Feb 1, 2020

  • ISEE
    Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle Mine

    By Tony Francelj, D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi

    Jan 1, 2002

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Journal: Blastserve A Technical Discussion Forum for ISEE Members / A discussion about cased wells.

    By Matheson and Miller

    Does anyone have any definitive information on vibration limits for damage to well casings near blasting? Also, are people using self-imposed limits when approaching cased wells? I can only tell you w

    Jan 1, 2010

  • ISEE
    Considerations in Pre-Split Blasting for Mines and Quarries

    By J Lyall Workman, Peter N. Calder

    "Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.

    Jan 1, 1993

  • ISEE
    Seismic-Controlled Blasting Near a Critical Tailings Dam: A Case Study from an Open Pit Copper Mine in Chile

    By Gabriel Gonzalez, Paulo Couceiro, Luis Manriquez, Alejandro Gutierrez, Juan Navarro

    A high-stakes blasting campaign was successfully executed at a major open pit copper mine in northern Chile. This operation posed a significant technical challenge due to its immediate proximity to th

    Jan 26, 2026

  • ISEE
    A Blasting Efficiency Descriptor "Bed" (for surface blasting)

    By Evan Jannoulakis, Wilfrid Comeau

    Using the Scaled Distance (SD) and the vector sum Peak Particle Velocity (PPVvs) from a single delay, preferably single blasthole, in a shot, a number is derived which has shown itself to be consisten

    Jan 1, 1998

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023

  • ISEE
    Economic and safety benefits of StratablastTM for steeply dipping coal seams - a case study

    By Tapan Goswami, Brent Geoff

    Mining multiple steeply sloping coal seams introduces challenges in terms of safety and productivity. Work on steeply sloping surfaces for the processes of bench preparation, mark-out, drilling, loadi

    Jan 1, 2010

  • ISEE
    Paper or Electronic Records – Ways to Improve Blast Documentation and Recordkeeping

    By Travis A. Davidson, Ralph E. Burnham, Cathy Aimone-Martin, J. Kelly Ratliff

    Blasters face a long list of tasks to execute daily—from vehicle inspections to blast design and layout, hole loading and tie-in, securing the site, and finally, safely executing the blast. Good pract

    Jan 21, 2025

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    How Lightning Detection Has Influenced AMAX Coal's Delta Mine

    By Steve Kane

    Lightning is a very real problem in the surface mining industry. Today, as adverse market conditions continue to influence the surface coal industry, it has become necessary that all functions of the

    Jan 1, 1992

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Implementation of a Real Time Traceability System from Mine to Plant

    By R. Ticona, J. Alarcon

    In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel

    Jan 1, 2024

  • ISEE
    Vibration Analysis for Blasting on a 16th Century Environment in Toledo - Spain

    By Jesus Pascual, Benjamin Cebrian

    A new Convention Center is going to be built in the millenary city of Toledo, right in the old city limits. The workings will need to excavate some 80.000 cubic meters of granite, which has, a trench-

    Jan 1, 2004

  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    Effect of Presplit Perimeter Control in an Underground Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders

    Feb 6, 2023

  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011