Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of MexicoBy Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Site Specific Study for Foundation Design of Iswar Gupta BridgeBy Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath
"Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig
Jan 1, 2015
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case StudyBy Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
Innovative Micropile Retrofi t of an Existing StructureBy Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman
"Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example
Jan 1, 2008
-
Analysis of Water Leakage in Downstream Dam Toe of Komani DamBy Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi
"Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita
Jan 1, 2016
-
Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial SandBy Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos
"Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p
Jan 1, 2017
-
Using Multiple Pile Types On A Single Project To Maximize BenefitsBy James F. Davis, Matthew A. Conte, Robert F. Tonning
This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted
-
Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?By Silas C. Nichols
FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie
Jan 1, 2005
-
A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris ProjectBy Sina Z. Yekta, Zhangwei Ning, Pierre Frappin
This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been
Sep 8, 2021
-
Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor AreaBy Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure FoundationsBy Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer
Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct
Sep 8, 2021
-
Verification Of Drilled Shaft Resistance By The Post Grouting MethodBy Suthan Pooranampillai
Verification of drilled shaft resistance is primarily obtained through the use of different load testing methods. Procedures utilized include conventional top down static loading, the Osterberg load c
Jan 1, 2010
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Slurry Wall Design for Construction Using Soil Structure InteractionBy Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Elimination of Environmental Footprint: LVCC Expansion - Foundation InstallationBy Zachary Q. Maassen
Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio
Jan 1, 2019