Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Getting Paid In Hard Times - I. Formation Of The Contract
By Dennis J. Riley
A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter
Jan 1, 1991
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station
By Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
Historical Evolution Of Deep Foundations
By Dean E. Matthews
The concept of a pile for construction is credited to a Neolithic tribe called the "Swiss Lake Dwellers" who lived in what is now Switzerland about 6,000 years ago. They used piling, not for supportin
Jan 1, 2003
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)
By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Mechanical Characterization of a Chemically Stabilized Soft Soil Reinforced with Fibers When Subjected to Tensile Solicitations
By J. M. N. P. C. Teles, Venda Oliveira P. J., Correia A. A. S.
"AbstractA laboratory work was performed to study the mechanical behavior of a Portuguese soft soil chemically stabilized with binders and reinforced with metallic fibers when subjected to tensile str
Jan 1, 2014
-
Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? Preface
By Zhou Lu-Jian
The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T
Jan 1, 1991
-
Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour
By Guo H. Lei
Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro
Jan 1, 2006
-
Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)
By Richard J. Finno
This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti
Jan 1, 2010
-
Influence Of Diameter On The Bearing Capacity Of Lateral Loaded Drilled Shaft
By Bin Zhang
Drilled shafts are a popular type of foundation for transportation applications. They feature the advantages of providing high bearing capacity and generating low construction noise. Advancements in
Jan 1, 2007
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility Tunnel
By Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022
-
Case Histories Of Geo-Column? Foundations - Synopsis
By Osamu Taki
This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl
Jan 1, 2000
-
Development Of The Osterberg Load Cell
By Charles L. Guild
I will add a few facts about the use and development of the Osterberg Test Load Cell and my association with Jorj. I first met Jorj in 1965 when the Guild Construction Co. drove 12" diameter cast-in-p
Jan 1, 1989
-
Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction
By E. E. De Beer
This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform
Jan 1, 1987
-
Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1997
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA
By P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
Hand-Dug Underreamed Piles At Embankment Place, London
By W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . Synopsis
By Lucien Weber
In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working
Jan 1, 1987
-
Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable Waterways
By Michael A. Knott
Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit
Jan 1, 2013
-
Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis
By B. N. Hira
A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t
Jan 1, 1996
-
Drilled Shaft Difficulties and a Micropile Solution
By Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018