Load Testing Of Deep Foundations Using The Osterberg Load CellBy David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?By Richard W. Hanford
The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an
Jan 1, 2001
-
Drilled Displacement Piles - Current Practice And DesignBy Prasenjit Basu
Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i
Jan 1, 2010
-
Development and Experiences on Versatile Applications of RD-pile WallBy Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
-
The Construction And Performance Of Prestressed Ground Anchors In Soils And Weak Rocks: A Personal Overview - SummaryBy Donald A. Bruce
The paper reviews aspects of the construction and performance of prestressed ground anchors installed in soils and weak rocks. Attention is focused on good practice for drilling, tendon fabrication an
Jan 1, 1991
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall PerformanceBy Reinhard Gnilsen
Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i
Jan 1, 1988
-
Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant StructureBy Tsunenobu Nozaki
"AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr
Jan 1, 2014
-
Simbat : High Strain Dynamic Test Of PilesBy Dominique Vié
Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera
Jan 1, 2002
-
Application of Multiple Excavation Support Systems in Brown Field ProjectBy Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De
"To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with
Jan 1, 2017
-
Load Testing High Capacity Drilled Shafts - SummaryBy Jorj O. Osterberg
Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a
Jan 1, 2002
-
New Technology of Force Monitoring of Post-Tensioning Ground AnchorsBy Shahid Islam, Lucian Bogdan
There is a rapid expansion of world’s infrastructure and simultaneously existing infrastructure is aging. The maintenance of infrastructures has been of particular concern to the engineering community
Jan 1, 2018
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Enhancements To The FHWA Deep Foundation Load Test DatabaseBy Carl D. Ealy
Work is being done to web enable the FHWA Deep foundation Load Test Database. Originally designed to function in the client server environment via modem, access to the database both for data maintenan
Jan 1, 2002
-
Soil Inclusions In Jet Grout ColumnsBy Timothy D. Stark
Jet grouting has increasingly become one of the ground improvement technologies used to address seepage concerns and to provide strength improvement of soils. The technique of jet grouting uses high p
Jan 1, 2009
-
Ground Support And Its ToolboxBy G. Sauer
"More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava
Jan 1, 2003
-
Design Of Concrete Tunnel Liners And Pipes By Ring Compression Theory ? SynopsisBy W. Lum
In the U.S., flexible metal pipe culverts are designed by ring compression theory because the pipes are capable of deflecting and deriving side support from surrounding ground. For economy, tunnel
Jan 1, 2010
-
Micropiles At The Transformation Ago ProjectBy Jim Bruce
The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.
Jan 1, 2011