Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical Soil
By Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City
By Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction
By Thomas A. Printz
The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac
Jan 1, 2013
-
Excavation Bracing Technology ? Synopsis
By G. F. Sowers
Excavation bracing is a special structural system. It is built from the top down. The design is controlled by the economical construction of another structure as well as by the movement of the ground
Jan 1, 2010
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.
By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Optimal Subsurface Investigation Approach for Overhead Transmission Structures
By Haijian Shi, Drew Pizzo
This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl
Jan 1, 2018
-
Recent Evolutions In Deep Foundation Technologies
By Maurice Bottiau
It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses
Jan 1, 2006
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary
By Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil Conditions
By Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
Rock Sockets
By D. E. Sherwood
Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern
Jan 1, 1991
-
Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program
By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols
Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou
Jan 1, 2018
-
Practical Aspects Of Compensation Grouting ? Synopsis
By Philip J. H. Ball
The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial
Jan 1, 2000
-
Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs Geotechnical
By Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC
By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li
"An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized
Jan 1, 2017
-
Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - Synopsis
By N. V. Nayak
Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were
Jan 1, 2000
-
Safe Execution Of Special Foundation Works Analysis - Concept - Implementation
By Walter Ensinger
Special foundation works is one of the most innovative sectors in civil engineering and construction. Both engineering techniques and construction machinery are undergoing continuous further developm
Jan 1, 2002
-
Excavation Support At The Capitol Visitor Center In Washington DC
By Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Design Of The BMIP Boat Section - Introduction
By Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994