Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Ac1 Range in S.A.E. 2335 Steel

    By H. H. Bleakney

    THIS paper presents evidence that in 3 1/2% nickel steel, the published temperature for the Ac1 transformation, l,275°F., represents the completion of that transformation, and that its inception occur

    Jan 1, 1941

  • CIM
    Ventilation System Design for the Wassa Underground Mine

    By B. S. Prosser, K. G. Wallace, A. Akansobe

    "This paper describes a ventilation project at the Wassa gold mine in Ghana. Golden Star (Wassa) (GSWL), a subsidiary of Golden Star Resources, owns and operates the mine. Golden Star holds a 90% inte

    Jan 1, 2019

  • CIM
    Mapping Orebody Hardness Variability for AG/SAG/Crushing and HPGR Circuits

    Arguably the SMC Test® has become the most popular laboratory hardness test in the world with over 17,000 tests having been completed to date, covering over 650 different ore bodies. It is now routine

    Jan 1, 2012

  • CIM
    Measuring Roof-Bolt Response to Axial and Shear Stresses: Laboratory and First in-situ Analyses

    By T. R. Kostecki, K. V. Jessu

    "Roof bolts are subjected to axial stresses, shear stresses, or both. Axial and shear stresses were compared between roof bolts machined with two and three slots. Shear stresses perpendicular to and a

    Jan 1, 2016

  • CIM
    Gold Exploration in Metamorphic Terrains Using Fluid Inclusion Compositions in Quartz: Signification of Their Volatile Content

    By D. Gaboury

    Most hydrothermal gold deposits contain quartz with fluid inclusions that record composition and temperature of the mineralizing event. Quartz has strong chemical and mechanical resistances to weather

    Jan 1, 2011

  • CIM
    Use of Concrete Floors in Cut-and-Fill Stopes at Madsen

    By R. Gutray, J. E. Grainger

    This paper deals with the use of a cement-deslimed mill tailings mixture for a scraping floor in cut-and-fill stopes at Madsen Red Lake Gold Mines Limited. It describes the mixing and placing procedur

    Jan 1, 1966

  • CIM
    A Segmented Reconciliation Matrix Approach to Monitor Gold Operations and Reserve Estimation

    By L. E. C. Pignatari

    Mine reconciliation is seen, for many, as a test of the quality of model estimates, while in fact it should be seen as a powerful tool for detecting and correcting problems in each step of mining oper

    Jan 1, 2011

  • CIM
    An Open Platform for Underground Vehicle Monitoring

    By Lorrie Fava

    Two needs in the mining industry, to enable overall process improvements, are open systems and network connectivity in underground mines. The Pando project, a collaboration between Symboticware, Vale

    Oct 1, 2010

  • CIM
    Recovery of Iron from Waste Slag of Pyrite Processing Using Reduction-Roasting Magnetic Separation Method

    By A. McLean, Q. R. Yang, Y. D. Yang, G. F. Zhang, P. Wu

    A considerable amount of waste slag from the pyrite roasting process is discharged every year. Recovery of iron from the waste slag is of great interest for comprehensive use of mineral resource, redu

    Jan 1, 2011

  • CIM
    A Chemo-Physical Model for Predicting Post-Fracking Pressure Build-up in Pierre Shale

    By A. Hayatdavoudi, K. G. Sawant, F. Boukadi

    "In this work, we found that contact between shale and water results in development of micro fractures. Based on results of experiments on Pierre shale, we conclude that appearance of micro fractures

    Jan 1, 2015

  • CIM
    Vanadium Oxides Leaching: An Overview

    By D. B. Dreisinger, M. R. Tavakoli

    Vanadium has been produced from both primary and secondary sources having various compositions. Vanadium pentoxide and vanadium trioxide are the most available and known sources of vanadium oxides. In

    Jan 1, 2014

  • CIM
    Experimental Study for Efficient use of RFID in Construction

    By Ali Montaser

    This paper presents an experimental study conducted to facilitate the use of RFID on construction job sites. The study focuses on deployment settings to provide data acquisition with higher accuracy f

    Aug 1, 2013

  • CIM
    Stereo Vision Based Worker Detection System for Excavator

    By H. Ishimoto

    It always has been a serious issue to improve safety in mine sites, demolition work sites, and civil engineering work sites. Especially, collision accidents caused by construction equipment damage not

    Aug 1, 2013

  • CIM
    Environmental Attack in Advanced Industrial Gas Turbines, a Problem with New Materials and Alternate Fuels

    By P. C. Patnaik

    Performance of industrial gas turbine engines in terms of power output, reduced cooling and efficiency have been continuously increasing in parallel with aero gas turbines due to the advances made in

    Jan 1, 2005

  • CIM
    Enhanced Liberation In HPGR Circuits

    High Pressure Grinding Rolls (HPGR) are said to be a good option in new grinding circuits. Due to their low energy consumption compared to other grinding systems such as SAG milling, there is a strong

    Jan 1, 2012

  • CIM
    Selective Removal of Mercury from Gold Mining

    By J. G. Stevens, S. W. Colley

    "Selective separations of metals and ions in mineral extraction and refining are becoming more challenging as ore bodies become more complex and environmental pressures increase. The separation and co

    Jan 1, 2016

  • CIM
    The Rio Tinto's P155 Smelters Now Operating At 210 KA

    By V. Gaudreault

    Rio Tinto Alcan (RTA) has three smelters that use the Alcoa P155 technology: two in Canada (Grande-Baie and Laterrière, Saguenay, QC) and one in the United States (Sebree, Kentucky). The oldest RTA P1

    Jan 1, 2011

  • CIM
    Remediation of a Uranium Processing Facility

    By Ernest Becker

    Golder Associates provided overall radiological direction and assistance to the client in their interactions with the Canadian Nuclear Safety Commission and operational radiation protection services f

    Aug 1, 2010

  • CIM
    Open-Pit Planning at the Adams Mine

    By F. J. West

    This paper deals with Jones & Laughlin Steel Corporation's new Adams mine, near Kirkland Lake, Ontario. After a brief discussion of ore structure, type, reserve tonnages, etc., the main body of the pa

    Jan 1, 1966

  • CIM
    Sheerness — A new coal mine for Alberta

    By Keith Haddock

    "The Sheerness Mine, a new surface coal mine located near Hanna, Alberta, went into full production in mid-1995. The mine, which is operated by Luscar’s subsidiary Forestburg Collieries (1984) Ltd., h

    Jan 1, 1997