Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Material Balancing of Assays From on-Stream Analyzer

    By Claude Bazin

    "The On-Stream Analyzer has proven and is still proving to be an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilization

    Jan 1, 1995

  • CIM
    The Plant Audit (97ca6ee7-2dc9-4753-846d-b993abc1472c)

    By A. J. Neale, B. C. Flintoff

    "In most mineral processing operations the term audit is usually reserved for the exercise of checking financial records and/ or safety practices. While these activities are time consuming, no one dis

    Jan 1, 1991

  • CIM
    Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian Orogen

    By K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy

    "Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri

    Jan 1, 2008

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • CIM
    Regional Geological Setting of Gold Deposits, Eastern Red Lake Area, Northwestern Ontario

    By James Pirie

    "The major Archean gold deposits in the Red Lake greenstone belt, which have produced over 374 million grams of gold since 1930, occur near the top of the lower komatiitic to tholeiitic mafic to ultra

    Jan 1, 1982

  • CIM
    Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet

    "Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu

    Jan 1, 1992

  • CIM
    The Application of Rare Earth Element Analyses in the Exploration for Volcanogenic Massive Sulfide Type Deposits (4936ee37-b636-4400-b88e-78f06ae61654)

    By G. H. Gale, M. A. F. Fedikow, L. B. Dabek

    Rare earth element (REE) data are reported for ores, sul?de-bearing rocks and host rocks from massive sul?de deposits and barren sul?de facies iron formations in Proterozoic volcanic rocks of the Flin

    Jan 1, 1997

  • CIM
    The Application of Rare Earth Element Analyses in the Exploration for Volcanogenic Massive Sulfide Type Deposits

    By G. H. Gale, M. A. F. Fedikow, L. B. Dabek

    Abstract-Rare earth element (REE) data are reported for ores, sulfide-bearing rocks and host rocks from massive sulfide deposits and barren sulfide facies iron formations in Proterozoic volcanic rocks

    Jan 1, 1997

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • CIM
    Experiences in Using Gas Dispersion Measurements to Understand and Modify Metallurgical Performance

    By Jose R. Hernandez-Aguilar, Chris J. Martin, Rob Thorpe

    "This study presents an approach to establishing relationships between metallurgical performance and the characteristics of the bubble population (gas dispersion) inside flotation cells. Bubble size D

    Jan 1, 2006

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • CIM
    The Roofing Granule Industry

    By V. L. Eardley-Wilmot

    Introduction We are all familiar with the bright and attractive colours of the roofs of our suburban houses and country cottages, but few of us fully appreciate the complex and highly technical nat

    Jan 1, 1946

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Crystallex’s Las Cristinas gold project

    By J. R. Goode

    "The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la

    Jan 1, 2005

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    King Mine No. 3 Shaft and Equipment

    By J. G. Ross

    IN the paper entitled Block Caving at the King Mine (1), which was presented at the Annual General Meeting held in April, 1934, at Quebec, it was pointed out that, owing to certain conditions and fina

    Jan 1, 1939

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    Discount rates and risk assessment in mineral project evaluations

    By Lawrence Devon Smith

    "The concept of risk is well established in the mining industry. It is acknowledged when estimates of reserves are expressed as proven or probable, when mining and metallurgical recoveries are applied

    Jan 1, 2003

  • CIM
    Experiences from Implementation of Advanced Process Control Projects

    By E. Sharifi

    Advanced Process Control (APC) has been one of the most beneficial tools in the past decades available to minerals processing industry. Low capital cost together with significant improvements in proce

    Jan 1, 2014

  • CIM
    Treatment of Talcose Molybdenite Ores

    By G. I. Mathieu, R. W. Bruce

    Flotation schemes for the separation of molybdenite from other minerals are based on utilizing the Inherent hydrophobicity of molygdenite (Fuerstenau1). This natural floatability was attributed to the

    Jan 1, 1974