Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Carbon Dioxide Use for pH Control at Greens Creek Mill

    By Tim Martin, Dave Tahija

    "In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p

    Jan 1, 2016

  • CIM
    Evolution of SAG Mill Process Control at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Erik Bartsch, Guy Comeau

    "The Xstrata Nickel Raglan Concentrator, located at the northern limit of Quebec’s Nunavik region has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high grade

    Jan 1, 2008

  • CIM
    Lamella Thickener Performance in Potash Refining (eda27180-f1f6-4ab3-854e-c986b2a1249d)

    By Douglas M. Smith, G. A. Maki

    "The initial development of the massive potash deposits of the prairie evaporite formation took place over a decade ending in 1970. The potash mining and refining facility near Rocanvi11e, Saskatchewa

    Jan 1, 1983

  • CIM
    Back to the Basics in Process Control

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "A major thrust in industrial automation over the past few years has been the exploration and incorporation of higher level (supervisory and optimizing) control strategies aimed at more fully exploiti

    Jan 1, 1998

  • CIM
    Assessing the Returns to Copper Exploration, 1989-2008

    By R. A. Leveille, M. D. Doggett

    "Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines

    Jan 1, 2009

  • CIM
    Coal Quality Estimation using Geophysical Logging Without Radioactive Sources

    By Filipe Beretta

    This study investigates geophysical logging capacity to predict coal quality. It was analyzed for possible correlation, some parameters determined via laboratory analysis of coal against results for t

    Oct 1, 2009

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007

  • CIM
    CIP - Who Needs It? A combination circuit of Gravity, Flotation and Intensive Leach may provide the Optimal Environmental and Cost Outcome for Gold Plants.

    By Garry Johansen, Andrew McCallum, Sandy Gray, Gary Patrick, Jennifer Abols

    "The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold pro

    Jan 1, 2003

  • CIM
    Geology and Evolution of Gold Deposits, Timmins Area, Ontario

    By W. O. Karvinen

    "In the Timmins area, a close spatial and chronological association exists between gold deposits and two major stratabound carbonate-rich members and related quartz-feldspar porphyries. Synvo/canic an

    Jan 1, 1982

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • CIM
    Processing of Calcium Carbonates

    By David R. Skuse, Jacek A. Kostuch, Steven M. Fortier

    "Particulate ground calcium carbonate (GCC) is used as a filler and coating pigment in a wide range of applications including papers, paints, plastics and films. In this paper we will overview the req

    Jan 1, 2004

  • CIM
    Flotation Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of a molybdenite flotation circuit using FLEET technology applied to kinetics data produced from laboratory flotation testing and distributed across the blocks of a mi

    Jan 1, 2007

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Introduction to the Meliadine Project

    By M. Gaumont, F. Robichaud

    "Agnico Eagle Mines Limited (AEM) is a Canadian-based gold producer with operations in Canada, Finland and Mexico. In 2010, AEM produced its first gold bar in Nunavut, Canada as it started its Meadowb

    Jan 1, 2016

  • CIM
    Rock Stresses Induced by Block Caving

    By K Morrison

    Different individuals have calculated the boundary stresses around elliptical openings in an infinite elastic medium for various conditions of loading. With caution, such calculations are useful in in

    Jan 1, 1964

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Mine Planning Guidelines for Developing Sustainable Closure Drainage Systems

    By Leslie F. Sawatsky

    Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie

    May 1, 2004

  • CIM
    Prospecting the Future: Meeting Human Resources Challenges in the Canadian Minerals and Metals Industry

    By Ryan Montpellier, Paul Hebert

    "Prospecting the Future: Meeting Human Resources Challenges in Canada's Minerals and Metals Sector is a comprehensive sector study of the short- and long-term human resource issues and challenges faci

    Jan 1, 2007

  • CIM
    The Highmont Concentrator Startup

    By R. S. Fukuhara, M. J. Allan

    "Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the

    Jan 1, 1982