Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    Health Impacts Extend from the Life of a Mine to the Life of a Community - Knowledge Gaps

    By P Kirsch, P Jagals, D Viswanathan, J Shandro, R LaBouchardiere

    The planning, design and operation of mines must include the development of positive environmental, community and land-use benefits if it is to achieve good corporate social responsibility and minimis

    Jul 10, 2012

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Challenges in Developing Integrated Process Models Based on Industrial Survey Data

    By M Yahyaei, F Vos, J Siliezar

    Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such

    Sep 1, 2014

  • AUSIMM
    Environmental Monitoring in Polish Coal Mines

    Polish coal mines are well equipped with methane monitoring systems,nevertheless the worsening conditions force a continuous impro- vement in the field of environmental monitoring. Application of m

    Jan 1, 1988

  • AUSIMM
    A Strain-based Failure Criterion for Pillar Stability Analysis

    By A Karrech, C Schrank, O Gaede, I Canbulat

    Strain-based failure criteria have several advantages over stress-based failure criteria: they can account for elastic and inelastic strains; they utilise direct, observable effects instead of inferre

    Nov 5, 2014

  • AUSIMM
    Testing new estimation techniques – rank and replace: a stockwork case study

    By D Finn, D Kentwell

    Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-

    Sep 20, 2017

  • AUSIMM
    Breakthrough in elliptical motion screen trial delivers significant performance

    By D Teyhan, J Kirsch

    Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive

    Aug 24, 2022

  • AUSIMM
    Breakthrough in elliptical motion screen trial delivers significant performance gains

    By D Teyhan, J Kirsch

    Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive

    Nov 8, 2021

  • AUSIMM
    Walk or Talk - Is the Current Mine Approval Process in Queensland Delivering Rehabilitation and Closure Success?

    By T Baumgartl, R I. Maczkowiack, O White, P D. Erskine

    Queensland legislation, industry codes and policies relating to mine rehabilitation and closure create the expectation of successful progressive rehabilitation and that the post-mining environment is

    Jul 10, 2012

  • AUSIMM
    New Microscope Laboratory at Mount Isa

    Early in 1950 a new laboratory was set up to deal with problems in mineragraphy, petrology and metallography. This paper describes the equipment, the organisation and association of the laboratory wit

    Jan 1, 1953

  • AUSIMM
    Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processing

    By S Fityus, K Koosmen, J Simmons

    The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for

    Jul 1, 2021

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    The Identification and Elimination of the Threat Posed by a Thickened Tailings Deposit in a Seismic Area

    By Phillips J. T, Hutton W. A

    This paper discusses why Argyle Diamonds adopted thickened tailings disposal in 1985 and how the system was developed over the next seven years. A wide ranging review of the thickened tailings disp

    Jan 1, 1996