Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • DFI
    Recent Developments In Continuous Flight Auger Piling

    By P. H. Derbyshire

    The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des

    Jan 1, 1989

  • DFI
    A Decade Of Concrete Embedded Walls In UK - Synopsis

    By Robert Fernie

    Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u

    Jan 1, 2000

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • DFI
    Sonic Integrity Testing - 1.0 Summary

    By A. F. van Weele

    In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to

    Jan 1, 1987

  • DFI
    Toward A Unified Design Standard For Steel Sheet Piling

    By Michael J. Garlich

    Steel sheet piling has a long history of use in a variety of permanent and temporary structures. Current engineering practice uses numerous publications and standards for design guidance. U.S. desig

    Jan 1, 2008

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Mini-Piling And Soil Anchors ? Introduction

    By Martin C. Jones

    This paper outlines the development of small diameter grouted piling, to deal with foundation problems in difficult soils conditions and in very restricted access areas. A number of applications are o

    Jan 1, 1987

  • DFI
  • DFI
    Marine Foundations Of Bridges In The Northeastern USA (dd1131f4-385d-4efe-8191-edcc7983fec3)

    By James S. Graham

    Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza

    Jan 1, 2013

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    Performance Of Drilled Displacement Piles In The Midwestern United States

    By W. Morgan NeSmith

    Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp

    Jan 1, 2009

  • DFI
    Technical Note Evolution Of Top Of Pile Measurement Techniques In Deep Foundation Static Load Testing

    By Jon Sinnreich

    Ensuring the accuracy of collected data during deep foundation static load tests is of paramount importance. Typically, pile head displacements are measured relative to a purpose-built reference syst

    Jan 1, 2009

  • DFI
    DFI Europe Monitoring and Instrumentation Committee Objectives

    By Rob van Dorp

    "AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta

    Jan 1, 2014

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Combined Loading Tests On Large Diameter Piles

    By A. Lyndon

    Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t

    Jan 1, 1989

  • DFI
    Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

    By Jean J. Abiassi

    The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t

    Jan 1, 1994