Ore-Unloading Wharf and Stockpiling System at Dosco Steel Limited, Sydney, N.S.By F. S. Thurner
This paper, a description of the new ore-unloading and stockpiling facilities at the Sydney Works of DOSCO Steel Limited, deals with a new approach to arrive at the most economical solution to combine
Jan 1, 1968
-
High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary FoundationsBy Brian D. Barkauskas, Terence P. Holman
A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr
Jan 1, 2017
-
Wallaby - The Horizontally Challenged OpportunityBarrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme
Jan 1, 2008
-
Improving Conveyor Transfer Point Performance in Hard Rock Mines (3df8afc1-5943-4b67-9bd9-6a87144e0c1e)By R. Shields
"Hard rock mines move large volumes of material, which can cause the conveyors that are essential to this movement to suffer lots of problems, including carryback, spillage, dust and belt wander. Many
Jan 11, 2017
-
The Adsorption Behavior Of Gold From Ammoniacal Solutions On Activated CarbonBy Q. Xu
The adsorption behavior of gold in ammoniacal solutions on to activated carbon has been studied. The gold loading capacity of the activated carbon used in the system and the recovery efficiency by the
Jan 1, 1995
-
Impact of Cation Substitution (Cd, Co) On the Geometallurgical Response of SphaleriteBy B. P. von der Heyden, P. Neethling, M. Tadieb, L. Babedi
The effects of trace element substitutions in sphalerite mineral structure on optimised floatation response have, as yet, not been fully constrained or fully understood. To further this important fiel
Jan 1, 2018
-
RI 8099 Radium Removal From Uranium Ores and Mill TailingsBy S. R. Borrowman
Mill tailings from conventional uranium extraction processes contain nearly all of the radium originally in the ore. Such tailings require controlled storage in perpetuity to safeguard the surrounding
Jan 1, 1975
-
Safe Blasting Parameters And Seismic Influences During Construction BlastingBy Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek
The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,
Jan 1, 2009
-
Rejection and Recovery of Heavy Metals from MSW Melting Fly Ash by Carrier-in-Pulp MethodBy R. D. Alorro
Melting has become a popular pre-treatment method for municipal solid waste (MSW) incineration residues in Japan. Although the method is effective in stabilizing the hazardous organic sub-stances such
Jan 1, 2014
-
Coal Mine Rock Dust Dispersibility Tests after Absorbing MoistureBy R. C. Gilmore, J. F. Brune
"Pulverized limestone rock dust used in United States underground coal mines to prevent and suppress coal dust explosions must easily disperse by forces of a methane or coal dust explosion. Moisture i
Jan 1, 2019
-
Preliminary Investigation of the Effect of Pressure on Flotation PerformanceIn a previous study, various pyrite depressants were examined to improve the flotation performance of a copper-sulfide ore. Optimal results from this study were used to examine the effect of elevation
Jan 1, 2005
-
Anomaly Enhancement in 2D Electrical Resistivity Imaging Method Using a Residual Resistivity TechniqueBy H. Ramazi, A. Amini
"This article is devoted to the introduction of a new technique of electrical resistivity data processing called residual resistivity (RR). We define RR as measured resistivity minus background resist
Jan 1, 2016
-
Conventional Tunneling Challenges in the Himalayas: A Case StudyBy Sharanappa Yalal, Rakesh Kumar Khali
"Himalayan geology poses the most challenging ground conditions almost anywhere in the world, one of the reasons thereof is their evolution as the youngest mountain chains. They are demonstratively ri
Jan 1, 2016
-
The Use of Rezoning Techniques to Model Historic Tailings FailuresBy D Reid
Run-out analyses of tailings storage facilities are typically undertaken using methods based on rheological theory. These are reasonable techniques to model the behaviour of tailings that, through sig
Jul 27, 2015
-
Calibrating LaModel for SubsidenceBy Keith A. Heasley, Jian Yang
"LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He
Jan 1, 2016
-
Vertical Pit Mining - A Novel Alternative to Open Pit or Underground Methods for Mining of Appropriate Massive Shallow OrebodiesBy P J. Terbrugge
The concept of vertical pit mining has been developed as an alternative mining method for the exploitation from surface of small, vertical or near-vertical, massive orebodies down to depths of some 20
Jan 1, 2000
-
Application of Voltammetry in Hydrometallurgical Dissolution and Deposition ProcessesBy E. Kuzeci, R. Kammel
"Lately various voltametric methods have gained increased attention as an analytic tool in hydrometallurgy. Voltammograms with mercury drop electrodes or glassy carbon electrodes provide information a
Jan 1, 1989
-
Design and Construction Procurement for the Amtrak Hudson Tunnel ProjectBy Phil Rice, Mohammed Nasim, Richard Flanagan
"The Gateway Trans-Hudson Partnership (GTHP), a joint venture of WSP USA, Inc., AECOM USA, Inc, and STV Incorporated, is providing preliminary engineering services to Amtrak for the Hudson Tunnel proj
Sep 1, 2019
-
Optimization Of Flash Smelter Offgas Cooling And CleaningBy Bengt T. Andersson
Outokumpu Consulting Engineers, Outokumpu Oy SF-02200 Espoo 20, Finland This paper describes experiences from some operating non-ferrous flash -smelters and focuses on the advances in smelter byprodu
Jan 1, 1983
-
Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold MineBy S Graskoski, S Craig, C Myburgh
Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora