Abstract
During the last decade Antofagasta Minerals? Los Pelambres Mine has dramatically increased its ore throughput following the fast initial phase ramp up through a series of planned incremental expansions. The original 85,000 mtpd, two SAG line plant was commissioned in 1999 and rapidly exceeded nameplate tonnage in only a few months. Following this, the inclusion of a pebble crushing circuit resulted in throughputs in excess of 114,000 mtpd and a recent, final third line SAG and ball mill addition have taken the plant to over 175,000 mtpd even with increasing ore hardness and changing ore feed characteristics. The progressive changes are described in this paper together with how the technical challenges have been met.
Citation
APA:
(2012) A Review and Update of the Grinding Circuit Performance at the Los Pelambres Concentrator, ChileMLA: A Review and Update of the Grinding Circuit Performance at the Los Pelambres Concentrator, Chile. Canadian Institute of Mining, Metallurgy and Petroleum, 2012.