Search Documents

Sort by

  • IOM3
    Probabilistic key-block analysis for support design and effects of mining-induced stress on key-block stability: a case study

    By R. Trueman, D. B. Tyler

    Numerical modelling was used to determine the magnitude and direction of stresses around drives both adjacent to and distant from open stopes in the South Crofty tin mine. Modelling predicted that dri

    Jan 4, 1993

  • SME
    Respirable Dust Measured Downwind During Rock Dust Application (6aa60bab-30fb-41ca-b96e-a68949f2654b)

    By M. L. Harris, J. Organiscak, S. Klima, I. E. Perera

    "The Pittsburgh Mining Research Division of the U.S. National Institute for Occupational Safety and Health (NIOSH) conducted underground evaluations in an attempt to quantify respirable rock dust gene

    Jan 5, 2017

  • AUSIMM
    A Review of European Acid Rock Drainage Initiatives

    By B Dold

    Western Europe is a dynamic region, with an emerging co-operation between the individual nations both politically, economically, technically and scientifically. The European Union, today with 15 membe

    Jan 1, 2003

  • SME
    Swiss Quartz Dust Guideline - A Tool for Managing the Health Risk Related to Quartz Dust in Early Project Stages

    By Matthias Neuenschwander, Andreas Theiler, Patrick Steinle, John Singer, Martin Vogel, Diego Martini, Ömer Ündül, Markus Weh

    "Quartz Dust is a major health hazard in underground works, wherever the ground contains quartz and depending on the chosen method of excavation. A research project initiated by the Swiss Tunnelling S

    Jan 1, 2016

  • SME
    Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022

    By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck

    Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti

    Dec 1, 2022

  • SME
    Validation of Modeled Rockmass Permeability Against Field Measurements in a Longwall Mine - SME Annual Meeting 2024

    By Steven J. Schatzel, Kayode M. Ajayi, Marcia M. Harris, Zoheir Khademian

    Predicting rockmass permeability is critical in evaluating various engineering designs, including estimating gas inflow to a longwall mine in the case of a hypothetical breach in the gas well. This st

    Feb 1, 2024

  • SME
    Blast-induced rock damage and optimized blast design in a hard-rock mine - SME Transactions 2014

    By K. M. Kim

    An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma

    Jan 1, 2014

  • SME
    Contribution Of Individual Support Components To Roof Stability In A Longwall Gateroad - SME Annual Meeting 2023

    By M. Sears, G. S. Esterhuizen, Z. Khademian

    According to the 2010-2019 Mine Safety and Health Administration (MSHA) accident report database, 91% of reported ground control accidents in U.S. longwall mines were caused by roof instability. Gater

    Feb 1, 2023

  • TMS
    Meeting Arsenic Standards In Drinking Water By January 2006: A Review Of Available Technologies

    Arsenic occurs naturally in rocks and soils, water, air, plants and animals. It can be further released into the environment through natural activities such as volcanic action, erosion of rocks and th

    Jan 1, 2005

  • NIOSH
    OFR-52-83 Microseismic Applications for Mining - A Practical Guide

    By Wilson Blake

    Increased application and interest in the use of microseismic monitoring to deal with ground control problems, Particularly those resulting in violent failures, has brought about the need for practica

    Jan 1, 1982

  • NIOSH
    OFR-81-76 Development Of An Automatic Fire Protection System For Mobile Underground Metal Mining Equipment

    By Gene R. Reid

    The contract objective is the development of an Automatic Fire Control System for Mobile Underground Metal Mining Equipment. The Phase I Report, which described the projected data handling plan, was p

    Jan 1, 1975

  • NIOSH
    IC 8578 How To Find Abandoned Oil And Gas Wells

    By K. H. Johnston

    This guide was written to furnish the coal industry with a description of techniques, instruments, and clues on how to find abandoned oil and gas wells that have penetrated coal seams. The report incl

    Jan 1, 1973

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • CIM
    The Starved Acid Leaching Technology (Salt) for Nickel Recovery from Saprolites

    By N. Waters

    "Nickel saprolite ores are normally mined as feed to Fe-Ni smelters or Ni matte smelting operations. The smelting processes typically require high Ni cut-off grades of approximately 1.5 to 2.2% Ni, de

    Jan 1, 2017

  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • SME
    Automated Data Acquisition For Subsidence Characterization - Background & Introduction

    By Frank W. Schmechel

    The subsidence monitoring program at the Old Ben No. 24 Mine was planned in 1976 as part of the on- going demonstration of longwall mining. The construction and installation of the network of surface

    Jan 1, 1979

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • CIM
    Advanced Control of Pressure Hydrometallurgical Plants

    By R. K. Jonas

    "Pressure leaching and pressure oxidation in autoclaves are important alternatives in the extractive processing of gold, copper and nickel ores. The application of advanced control to pressure leach a

    Jan 1, 2012

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014