Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Medium-Term Performance of Waste Rock Covers ù Rum Jungle as a Case StudyBy J Benn, V Kuznetsov, G Timms, A Spain
Earthen covers are now widely used in the mining industry to control the generation rate and/or release rate of low quality drainage from piles of sulfidic minewastes. Covers are usually designed to r
Jan 1, 2003
-
OFR-22-76 Technical And Economic Study Of An Integrated Single Pass Mining System For Open Pit Mining Of Deep Oil Shale Deposits ? Phase I Report ? Section I. SummaryBy Carlie E. Banks
Tasks during Phase I of this contract effort were performed in four principal functional areas. These were geology, hydrology, reclamation and mining. Data were gathered from literature reviews, mine
Jan 1, 1975
-
Magnesium Alloy Production in China ù The Quay Magnesium ExperienceQuay Magnesium Limited (QMG) listed on the Australian Stock Exchange in late September 2004 having raised approximately A$30 million with the object of designing, constructing, commissioning and opera
Jan 1, 2006
-
Thiosulfate Decomposition in the Presence of SulfidesThe mechanism of thiosulfate decomposition and the products formed were investigated in the presence of pyrite or pyrrhotite in copper-ammonia solutions used for leaching gold. The presence of the sul
Jan 1, 2005
-
Learning from Workers’ Near-miss Reports to Improve Organizational Management Mining, Metallurgy and ExplorationBy Brendan Demich, Joseph McGuire, Emily J. Haas
Near misses recorded and reported by workers can provide awarenessto the potential causes of injury and prompt safety management initiatives. Although most companies require near-miss reporting, it is
-
Project DevelopmentBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.
Jan 1, 2015
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Formal Assessment and Measurement of Data Utilization and Value for Mines Mining, Metallurgy and ExplorationBy M. Mustafa Kahraman, Sean Dessureault, W. Pratt Rogers
Most contemporary mines have considerable amounts of data. Structured and unstructured large data sets are colloquially named big data. Much of the data in mining operations come from a variety of sys
-
RI 4459 Physical Properties Of Mine Rock Part IBy S. L. Windes
This report presents a tabulation of the physical and petrographic properties of Over 100 rock types from operating mines or mineral-investigation projects. The physical properties include the followi
Jan 1, 1949
-
Controlled Blasting for Civil Construction in an Urban EnvironmentBy R Domotor
Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r
Nov 8, 2011
-
The Critical Importance Of Strong Cyanocomplexes In The Remediationn And Decommissioning Of Cyanidation Heap Leach OperationsBy Craig A. Johnson
Cyanide speciation and behavior have been examined at three active heap leach operations, three heaps undergoing rinsing, and three sites with cyanide contaminated groundwater, all in the southwestern
Jan 1, 1998
-
Precipitation Hardening Optimization by Partial Substitution of Si and Mg with Ge and Li in Lean 6xxx AlloysBy Sigmund J. Andersen, Eva A. Mørtsell, Jostein Røyset, Randi Holmestad, Oddvin Reiso, Yanjun Li, Øyvind Paulsen, Calin D. Marioara
"With the purpose of increasing the extrudability of lean alloys, we reduce levels of the alloying elements Mg and Si in a 6xxx extrusion alloy. To avoid sacrificing strength, we investigate the compe
Jan 1, 2018
-
Application Of Percolation Theory To Assessment Of Permeability Enhancement By Micro-Hydrofracturing For In Situ Copper LeachingBy T. M. Yegulalp
A numerical model is being developed to assess the enhancement of permeability by improved fracture connectivity by micro-hydrofracturing. A generic two-dimensional percolation model has been develope
Jan 1, 1995
-
Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in CanadaBy Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
Biological Cyanide DegradationBy D. J. Adams
Cyanide heap leaching is the predominant technology used in processing low-grade gold ores. During closure ora heap leach operation, residual cyanide must be removed from the process and waste solutio
Jan 1, 1998
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017
-
-
Technology News - More P&H Shovels Operate in Canadian Oil SandsP&H MinePro Services Canada is supplying Syncrude Canada three more of its model4100BOSS electric mining shovels. The shovels will be delivered during 2003. Syncrude’s oil sands operations already u
Jan 1, 2003
-
Render-Safe Operations in an Urban EnvironmentBy Robert McClure, Carlton Lehman
Rendering safe explosives in an urban environment presents a unique challenge due to the safety concerns and disruption to the general public. Potential damage to the surrounding homes, businesses, ut
Feb 1, 2020
-
Riyadh Metro TBM Construction and Knowledge TransferBy Henning Schwarz, Ade Ogunsola, Anas Almousa
"The Riyadh Metro, commissioned by Arriyadh Development Authority “ADA” - the executive arm of The High Commission for the Development of Arriyadh -, forms part of a new public transport-system of Sau
Jan 1, 2016