Search Documents

Sort by

  • AUSIMM
    Horizontal Stress Control in Underground Coal Mines

    By Nemcik JA, Gale W. J

    The magnitude and orientation of the in situ stressfield has been determined as a key factor in controlling the stability of openings for both coal mine development and extraction. Monitoring of r

    Jan 1, 1992

  • SME
    Belt Line Construction

    By Scott G. Britton

    This chapter is concerned with the construction of the dynamic component of belt haulage systems. The dynamic system includes the belt line and tailpiece extension and retraction movements in a produc

    Jan 1, 1983

  • CIM
    Stacking of potash mill tailings

    By G. A. Maki, P. J. Fullman, R. G. Roden

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1990

  • SME-ICGCM
    Monitoring Of The Interaction Effects Over A Longwall Panel In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The Phalen Colliery in the Sydney Coalfield is extracting the 2.6 m thick Phalen Seam by the panel and pillar longwall retreat method. Abandoned workings occur in the Harbour Seam 140 m above and over

    Jan 1, 1993

  • AUSIMM
    Developments in Coal Mine Tailings Disposal and Rehabilitation

    The conventional approach to the disposal of fine coal mine tailings, which involves piping the tailings as an aqueous slurry to a storage where they remain in the form of a permanent wet deposit,

    Jan 1, 1991

  • SME
    Recent Developments In Geotechnical Monitoring And Investigation Equipment ? 1.0.0 Introduction

    By I. Weir-Jones

    [Currently the cost of carrying out 'in situ' geotechnical investigation programmes or installing and operating monitoring systems at construction or mining sites is rising var." rapidly. Th

    Jan 1, 1975

  • CIM
    An example of geological modelling and data manipulation with a microcomputer: Bullmoose Coal Mine, northeastern British Columbia

    By Ward E. Kilby, Bruce I. Mcclymont

    "Data from the South Fork Pit Area of the Bullmoose deposit in northeastern British Columbia are used to demonstrate the usefulness of microcomputers to the on-site geologist. The technique utilizes a

    Jan 1, 1985

  • SME
    Surface-Geophysical Investigation Of A Landfill In Hania, Crete

    By P. M. Soupios

    A near geophysical surface investigation of a landfill area close to the Hania city, in Crete Island, Greece, was conducted as inextricable phase of a preliminary geotechnical, geological and hydrogeo

    Jan 1, 2005

  • NIOSH
    OFR-30(2)-80 Microseismic Monitoring Of A Longwall Coal Mine - Volume II - Determination Of Seismic Velocity

    By H. Reginald Hardy

    This report is Volume II of a three volume final report dealing with the microseismic monitoring of a longwall coal mine. The research presented in Volume II is concerned with the evaluation of field

    Jan 1, 1977

  • IMPC
    A Molecular Modeling Study of Oleate Monolayers Adsorbed at Calcium Mineral Surfaces

    By Pradip, Beena Rai

    A molecular modeling study was carried out on an adsorbed oleate monolayer on the surfaces of three calcium minerals, fluorite, calcite and fluorapatite using Universal Force Field (UFF) potentials. T

    Jan 1, 2003

  • ISEE
    Journal: Safety Talk / Every Number Tells A Story

    By Paul Downing

    A typical day for a blasting company includes what seems to be an infinite list of tasks dealing with numbers. Whether determining the exact amount of explosives material in inventory, the number of h

    Jan 1, 2008

  • SME
    Comparison of Performance of Two Commonly Used Flexible Dilatometers (FDT) in Determining Deformation Modulus of a Tunnel Host Rocks ? Introduction

    By Morteza Gharouni Nik

    Flexible Dilatometer Test (FDT) is one of the in-situ test methods for determining the deformational characteristics of rock masses. In this study, several dilatometer tests have been conducted in dif

    Jan 1, 2008

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • AIME
    Minerals Beneficiation - Handling and Drying of Wet Ambrosia Lake Ores

    By R. J. Stoehr, F. Howell

    Since the ore mined in the Grants-Ambrosia Lake uranium area is taken from a water-saturated sandstone formation, part of the milling operation includes a drying process. The authors discuss the meri

    Jan 1, 1961

  • SME
    Prediction Of Geology For Tunnel Design And Construction

    By Charles S. Robinson

    INTRODUCTION Geology, the science of the earth, is the fundamental science in the construction of a tunnel. The approximate site of a tunnel is determined by its purpose. The geology of the tunnel

    Jan 1, 1997

  • DFI
    Bearing Capacity And Slope Instability Solved By Novel Ground Engineering Solutions

    By T. J. Snell

    Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes

    Jan 1, 2006

  • IIMP
    Evaluation of isep® continuous ion exchange technology for the removal of nickel from cobalt sulphate electrolyte

    The paper point out the testwork has been carried out with real process solutions from the Chambishi cobalt plant in Zambia, showing that the ISEP® continuous ion exchange system can effectively remov

    Sep 13, 2001

  • CIM
    The use of Personal Computers at Kidd Creek for Process Data Monitoring and Analysis

    By Gordan Marrs, O. Matwijenko

    "The Kidd Creek metallurgical site has been highly integrated to maximize revenues from its base metals mines. The site's operations include a Concentrator processing 4.3 million tonnes per year of co

    Jan 1, 1989

  • AUSIMM
    Geology and Structure on the Mahakipawa Gold Deposit, Marlborough: Preliminary Results

    The Mahakipawa gold deposit is located 21 km northwest of Blenheim. It became the site of a small hardrock gold rush in 1889 following nearby alluvial gold discoveries in 1888. The study investigates

    Jan 1, 1993

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010