Search Documents

Sort by

  • CIM
    Application of Flocculants In Hydrocyclone Separation

    By H. A. Hamza, J. Visman

    "This is a report on the combined application of ""long-chain"" flocculants and classifier cyclones in the field of slimes treatment, with emphasis on the simultaneous thickening and clarifying of ind

    Jan 1, 1973

  • SME
    Panel Discussion Of Grinding Circuit Control

    By F. L. Bazzanella

    Cyprus Pima has two concentrators, one with a conventional crushing-grinding circuit and the other using semi-autogenous grinding followed by ball mills.

    Jan 1, 1978

  • TMS
    Lead Sulfate Scale in a Copper Smelter Acid Plant

    By J. M. Rapkoch

    In late October 1996, an acid plant at a major U.S. copper smelter was faced with unexpected and rapidly increasing pressure drop across the gas cooling tower in the acid plant, indicating a build-up

    Jan 1, 2000

  • CIM
    Platinum Exploration on the Great Dyke of Zimbabwe

    By D. J. Bowen

    "Abstract -The Great Dyke extends for 540 km along strike, to unknown depth, and varies in width from 3 km to 11 km. Rb/Sr age determinations gives values of approximately 2470 Ma.The Dyke consists of

    Jan 1, 1994

  • IMPC
    Ore For The Optimization Of The Flotation Strategy

    The present study investigates the nature of gold mineralogical distribution and association in a Cu-Au flotation circuit (1.6 g/t Au, feed head grade). The approach used in this study involves a comb

    Sep 1, 2012

  • SME
    Longwall Mining - The Tools For The Job

    By R. H. Thorpe

    In the earliest days of mining coal the obvious method was by bord and pillar working. Longwall in Britain developed from this as an expedient to overcome bottlenecks arising from ? 1) increasing

    Jan 1, 1976

  • NIOSH
    RI 8923 The Phase Relationship of Talc and Amphiboles in a Fibrous Talc Sample

    By Robert L. Virta

    The Bureau of Mines examined a fibrous talc sample from the Gouverneur talc district in New York by transmission electron microscopy (TEM) and polarized light microscopy to determine the mineralogical

    Jan 1, 1985

  • CIM
    Recrystallization of AZ31 Magnesium Alloy during High Speed Rolling and Subsequent Annealing

    By Abu Syed H. Kabir, Mehdi Sanjari, Steve Yue, Jing Su, In-ho Jung

    AZ31 magnesium alloy sheets were produced by high speed rolling (HSR) at 1000 m/min at a low temperature of 100 ?. A high reduction of 72% can be achieved in single pass. At the reduction of 30%, the

    Jan 1, 2015

  • CIM
    From ore to ferroalloy at Niobec Mine: The role of the geologist in ISO 9002 implementation

    By Eddy Dénommé, Deni Villeneuve

    "Niobec mine, a producer of pyrochlore concentrates since 1976, became a producer of ferroniobium in 1994 and achieved accreditation to the ISO 9002 standard in 1995. The goal of ISO 9002 is to ensure

    Jan 1, 1997

  • IMPC
    Flotation and Surface Interactions of Wollastonite/Dodecylamine System

    By Willis Forsling, Prabhakar Swarna, Hanumantha Rao Kota

    The solubility of wollastonite and its Hallimond flotation behavior as a function of dodecylamine concentration and pH are examined. The flotation response is characterized by adsorption and surface e

    Jan 1, 2003

  • SME
    Heinrich Revisited: a New Data-Driven Examination of the Safety Pyramid "Mining, Metallurgy & Exploration (2020)"

    By Jennifer L. Bell, PATRICK L. YORIO, Emily J. Haas, Susan M. Moore, Lee A. Greenawald

    Although researchers have struggled to replicate Heinrich’s safety triangle findings (Heinrich 1931) for various reasons (e.g., no access to his original database and it is unclear if the database was

    Jul 25, 2020

  • ISEE
    Geospatial Modelling Methods to Incorporate Subdrill in Powder Factor Calculation and Mine to Mill Analytics

    By Stephen Mansfield

    In open-pit mining operations, the drill and blast processes have a significant impact on the downstream operational performance of crushing and grinding of ores and recovery of metal. The blast patte

    Feb 6, 2023

  • ISEE
    Mining Cost Optimization Strategy Based on Adaptive Blast Design

    By Huang Daguang, Paulo Couceiro, Juan Navarro

    Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co

    Feb 6, 2023

  • SME
    Development and Reconciliation of a Mine Operation Value Chain Flowsheet in IES to Enable Grade Engineering and Process Mass Simulations for Scale-up and Strategic Planning Analysis "Mining, Metallurgy & Exploration (2021)"

    By T. BACHMANN, G. SHAPLAND, E. Amini, N. BEATON, M. BECERRA

    In this study, several methodologies to manage low grade and often competent portion of the ore have been proposed and tested in lab, pilot and operational scales. Relevant to this subject, the Cooper

    Sep 16, 2020

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • DFI
    Assessment of the Durability of Cementitious Barrier Materials

    By Stephan A. Jefferis, Adrian H. Bath

    "This paper draws together some themes on the durability of barrier systems, and particularly cementitious systems. For contaminated land and water retaining structures, durability can be poorly addre

    Jan 1, 2016

  • AIME
    Revision of the Mining Laws

    By AIME AIME

    ON JULY 12, 1921, S. S. Arentz, representative at large from Nevada, introduced in the House of Representatives, under the number H. R. 7736, a bill to revise, amend and codify laws of the United Stat

    Jan 1, 1921

  • SME
    Selection and Design Factors for a Variable-Density TBM at the I-64 Hampton Roads Bridge-Tunnel Expansion Project (HRBT) - RETC2022

    By Alejandro Sanz, Juan Luis Magro, David Mazeyrie

    The Hampton Roads Bridge-Tunnel Expansion Project (HRBT), initiated by the Virginia Department of Transportation (VDOT), will add two new 1.5-mile TBM bored tunnels to the two existing immersed-tube t

    Jun 13, 2021

  • SME
    InSAR Monitoring of Tunneling Surface Displacement - RETC2021

    By Brian Young, Ben Pantony

    Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O

    Jun 13, 2021

  • IOM3
    Simply the Best; Presidential Address to the South Western Branch of IMinE

    By G Williams

    Discussing equipment, systems of work, the need for updated programmes of local seismic exploration, and developments within the South Wales coalfield.

    Jan 1, 1993