Search Documents

Sort by

  • NIOSH
    RI 4488 Investigation Of Rush Creek Zinc District Marion County, Ark.

    By Louis C. Brichta

    The Rush Creek district of Marion County, Ark., has had a more or less continuous record of zinc production over the past 40 years. The ore has come from many small mines working on oxidized and semi-

    Jan 1, 1949

  • CIM
    A fresh approach to mine organization and incentive planning based on experience at Campbell Chibougamau Mines Ltd. (now Campbell Resources Inc.)

    By J. G. Strasser

    "There has been considerable output over the last three decades from the social sciences concerning man and his working environment. In the mining industry at large, however, authoritarian, hierarchic

    Jan 1, 1981

  • IMMS
    A New Phosphate Anomaly in the South Mexican Pacific

    By Arturo Carranza Edwards

    Sedimento II oceanographic cruise, on board of the B/O El Puma, shows a new high anomaly or phosphate associated with shelf sediments from the south Mexican Pacific. Recently, were found two anomalie

    Jan 1, 2000

  • SME
    Optimization of surface mining dig limits with a practical heuristic algorithm

    By Y. V. Vasylchuk

    An algorithm is presented for optimizing the classification of surface mine material subject to excavating constraints. High-resolution, expected-profit models are optimized to classification maps sub

  • SME
    Evaluation Of Progressive Rib Failure In Thick Coal Seams

    By W. C. Smith

    Even with the most conservative mine plan, rib instability can occur unexpectedly, and if not adequately dealt with, can progress from a nuisance to a major safety hazard. This Bureau of Mines paper e

    Jan 1, 1989

  • SME
    Permitting A High Profile Mine

    By R. E. Nelson

    The Alton Coal project, located in south-central Utah, lies at one point just over six miles from Bryce Canyon National Park. This region of the southwestern United States has been called the "Golden

    Jan 1, 1988

  • AUSIMM
    Managing uncertainty in large open pit geotechnical modelling

    By R Hao

    Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,

    Jun 22, 2022

  • AUSIMM
    Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal Smelters

    By I KylmSkorpi, H Mansikkaviita

    The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se

    Jan 1, 2008

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • SME
    Confidence Interval Estimation For Minable Reserves

    By B. M. Davis

    The uncertainty associated with a reserve estimate has generally been expressed as a subjective ranking rather than a quantitative expression of either reliability or uncertainty. These rankings of es

    Jan 1, 1992

  • CIM
    Bibliography of Canadian Contributions in the Field of Rock Mechanics

    By F. L. Casey

    "Part 1 – Published Papers Baria, G., and Boshkov, S., ""Insights into Undercuttingin Block Caving"", Proc. 5th Rock Mech. Symp.,Mines Br. - Information Canada, 41-58, 1970.Barron, K., Coates, D. F.,

    Jan 1, 1971

  • AIME
    Prereduced Iron Ore Pellets: State Of The Art – Part II

    By Morris M. Fine, Norwood B. Melcher

    It is out of the question, at this time, to select any one prereduction process as superior to the others. It is apparent that several share a basic similarity and that within the groups listed in Par

    Jan 8, 1966

  • IMPC
    Process And Productivity Improvement Of An Iron Ore Washing Plant By Column Flotation

    By T. V. Vijaya Kumar

    Most of the iron ore washing plants set up in India consist of sizing of the ore by dry / wet screening, washing and classification by screw classifiers followed by multi-stage hydrocycloning of screw

    Sep 1, 2012

  • NIOSH
    Potash Salts From Texas-New Mexico Polyhalite Deposits - Commercial Possibilities, Proposed Technology, And Pertinent Salt-Solution Equilibria - Introduction - General Information On The Potash Industry

    By John E. Conley

    Of the three chemical elements most vitally essential for plant growth the United States, before World War I, had developed ample domestic supplies of but one-phosphorus. During and shortly after the

    Jan 1, 1944

  • NIOSH
    OFR-1-74 Development Of High Strength Titanium Diboride Composites For Non-Sparking Tool Applications

    By L. Kaufman

    Fifteen boride composites were synthesized by hot pressing and evaluated by physical and incendivity testing as non-sparking tool materials. The incendivity tests, conducted at the U. S. Bureau of Min

    Jan 1, 1973

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • SME
    Evaluation Of An Area Dragline Mining Project Using Simulation Models

    By Philip Morey

    Large scale surface coal mining will be required to fill future energy demand in the United States. In realization of this long-term commitment to coal resources, the U.S. Energy Re-search and Develop

    Jan 1, 1978

  • IIMP
    Diseño de llenado de escombreras considerando variables ambientales

    By Fernando Machuca Pérez

    "La minería genera una gran cantidad de desechos de material como lastre, ripios y escorias, que son depositados en un área sin considerar el impacto ambiental que estos producen. En ese sentido, el d

    Sep 1, 2015

  • NIOSH
    RI 7896 Methods and Costs for Stabilizing Fine-Sized Mineral Wastes

    By K. C. Dean

    Fine-sized mineral wastes discarded by ore milling plants require stabilization to prevent air and water pollution. Stabilization has been attained by physical, chemical, vegetative, and combination p

    Jan 1, 1974

  • NIOSH
    RI 5296 Investigation Of Tuffs Near Lysite, Wyo., For Selenium ? Summary

    By F. D. Everett

    The exploration work on a seleniferous tuff deposit near Lysite, Wyo., was confined chiefly to an area of approximately 1 square mile selected on the basis of prior examination and sampling work by th

    Jan 1, 1957