Search Documents

Sort by

  • CIM
    Maximizing fuel cell test reliability

    By C. Andrews

    Fuel cell testing requires fully automated operation, on-site configuration of tests, and real-time monitoring for performance and failures. Balancing the flexibility and programmability of a test sta

    Jan 1, 2005

  • AUSIMM
    Performance Optimisation of the Imhoflot G-Cell for Fine Coal Cleaning

    By V Gupta, Z Huang, S K. Biswal

    G-Cell is a new design modification of the Imhoflot pneumatic flotation technology, which utilises a self-inducing aerator inside a downcomer, where bubble-particle attachment takes place. The present

    Jan 1, 2005

  • DFI
    Pile Load Testing in New York City

    By Joel Moskowitz, Jan Cermak

    "New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o

    Jan 1, 2005

  • DFI
    Lateral Capacity of Drilled Shafts Considering Push-Pull Resistance

    By Ke Yang

    "Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent

    Jan 1, 2005

  • AUSIMM
    Real-Time Risk Analysis and Hazard Management

    Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar

    Jan 1, 2005

  • DFI
    Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques

    By Huw Williams

    "Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi

    Jan 1, 2005

  • SME
    Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case Study

    By D. Drymonitis, G. Gialoglou

    "Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a

    Jan 1, 2005

  • DFI
    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2005

  • AUSIMM
    Management of Seam Gas Emission and Spontaneous Combustion in a Highly Gassy, Thick and Multi Seam Coal Mine ù A Learning Experience

    This paper describes operational experience with seam gas and spontaneous combustion management, gained during ten years of production history (1993 to 2003) in the Wynn seam at Dartbrook Coal mine. I

    Jan 1, 2005

  • AUSIMM
    The Continuing Evolution of Gas Drainage in Australia

    By E Yurakov, D J. Ashelford, M I. Slate

    The push for increasing coal production rates continues to place increasing demands on mine management to safely and effectively control seam gas. Gas drainage strategies applied vary in both effectiv

    Jan 1, 2005

  • AUSIMM
    The Iron Magnet Deposit

    By G Bubner, C Gaughan

    Magnetite mineralisation within the South Middleback Range has been known since the early 1930s; however, it was not until 1989 that BHP (then owners of the Middleback Ranges mining leases) drilled 10

    Jan 1, 2005

  • AUSIMM
    An Investigation of Air and Dust Flow Patterns Around the Longwall Shearer

    By S Chaudari, T Ren, T Harvey

    Management of respirable dust on longwall face remains a challenging issue for mine operators, particularly for the new generation of thick seam longwalls. A fundamental understanding of the airflow b

    Jan 1, 2005

  • AUSIMM
    Uranium Recovery From Highly Saline <i>In Situ</i> Leach Solutions by Ion Exchange

    By J Davidson

    Ion exchange using strong base resins is a well established technology for the recovery and purification of uranium from sulfuric acid leach liquors. Production of uranium at the Beverley Mine in Sout

    Jan 1, 2005

  • DFI
    Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration Resistance

    By Glen Mann, H. G. Vestberg, Robert D. Holtz

    "Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically

    Jan 1, 2005

  • TMS
    Precursor synthesis of fibrillar nanocrystalline nickel powder

    By WU Jian-hui

    Keywords: metallic material, precursor synthesis, precipitation, nickel, fibrillar powder The composition and morphology of the precursor of fibrillar nanocrystalline nickel powder prepared by oxa

    Jan 1, 2005

  • SME
    Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, Germany

    By Axel Nitschke, Josef Arnold

    Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup s

    Jan 1, 2005

  • CIM
    A History of Improvements at the Kemess Concentrator

    By Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman

    "Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments

    Jan 1, 2005

  • DFI
    Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted Piles

    By David T. Farber

    "Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste

    Jan 1, 2005

  • AUSIMM
    Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?

    When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h

    Jan 1, 2005