    The Development and Commissioning of Ontario’s First Diamond Mine – The Victor Diamond Mine

    By Ian Holl, Adam Hempstock, Rickardo Welyhorsky, Niel Morrison

    "The Victor Diamond Mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario and was completed appr

    Jan 1, 2010

  • NIOSH
    RI 9600 - Application of Field Measurements and Computer Modeling To Evaluate Deep Mine Shaft Stability in Northern Idaho

    By M. J. Beus

    Researchers at the U.S. Bureau of Mines have developed personal-computer-based data acquisition, instrumentation, and mine visualization and modeling techniques to evaluate a mine accessway in a deep

    Jan 1, 2010

  • NIOSH
    RI 9582 - In Situ Stress At The Lucky Friday Mine - (In Four Parts): 4. Characterization of Mine In Situ Stress Field

    By J. K. Whyatt

    Researchers at the U.S. Bureau of Mines collected and analyzed overcore measurements and other indicators of in situ stress characteristics at the Lucky Friday Mine, Mullan, ID. An analysis of these d

    Jan 1, 2010

  • DFI
    Analysis And Design Of A Piled Foundation For A Tall Tower ? Synopsis

    By I. K. Ozaydin

    Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower

    Jan 1, 2010

  • NIOSH
    RI 9396 - Copper Exchange Capacity of Clays and Their Potential Effect on In Situ Copper Leaching (0dcef1a7-b655-4afa-bf20-0928bb117568)

    By J. S. Gomer

    The U.S. Bureau of Mines conducted Cu exchange tests for six common clays under simulated in situ leaching conditions. Regression equations were obtained from the data expressing the Cu exchange capac

    Jan 1, 2010

  • ISEE
    Numerical Modelling and Electronic Initiation to Assist Blasting in Heavily Jointed Rock

    By Andrew Theobald, Peter Dare-Bryan, Trevor Byers

    The use of advanced modelling techniques and the timing flexibility of electronic initiation systems allows for unprecedented control over blast outcomes as shown in several complex blasting problems

    Jan 1, 2010

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • SME
    Cobalt Recovery From Copper Solvent Extraction Raffinate Using Ion Exchange Resins

    By M. Rodgers

    Dow Water & Process Solutions (DW&PS) was approached by ASARCO Inc. to attempt to recover cobalt and copper from their copper solvent extraction (SX) raffinate. Cobalt is added to many copper electrow

    Jan 1, 2010

  • NIOSH
    RI 9594 - The Reduction of Airborne Dust Generated by Roof Bolt Drill Bits Through the Use of Water

    By Laxman S. Sundae

    In the vast majority of American coal mines, roof bolt holes are drilled dry, mainly because of mine operator concern with the spent water creating adverse working conditions. Wet drilling, however, c

    Jan 1, 2010

  • SME
    The Concurrent Construction Of Two Side By Side Declines Utilizing An Atm-105 Road Header As The Primary Means Of Excavation

    By A. J. Dudzik

    In 2006 Arch Materials initiated the development of an underground limestone mining complex. The decision to proceed with the project was the end result of several years of market research and geologi

    Jan 1, 2010

  • SME
    Decreased Carbon Footprint Through Effective Coal Degasification

    Growing concerns of climate change and its potential association with the release of greenhouse gasses to the atmosphere have prompted possible legislation which would require minimization of greenhou

    Jan 1, 2010

  • NIOSH
    RI 9493 - Environmental Impacts of Mine Waste Sandfill

    By R. L. Levens

    The Underground Injection Control program was promulgated in 1981 by the U.S. Environmental Protection Agency under the provisions of the Safe Drinking Water Act. Placement of mine waste backfill unde

    Jan 1, 2010

  • DFI
    Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis

    By A. K. C. Chan

    Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460

    Jan 1, 2010

  • NIOSH
    RI 9409 - Calculation of Vertical Stress Exerted by Topographic Features (e01163ef-449c-47ba-aaf6-96bea50d6389)

    By Valois R. Shea-Albin

    An accurate assessment of the vertical stress on a coal seam at depth is important for mine design. Vertical stress calculation techniques presently available either are not sufficiently accurate or c

    Jan 1, 2010

  • NIOSH
    RI 9361 - Direct Tomographic Reconstruction and Applications to Mining

    By W. P. Stroud

    In this U.S. Bureau of Mines report, the conditions required for the direct reconstruction of a tomogram from observed line integrals are examined. Because of the limited access to the working faces i

    Jan 1, 2010

  • CIM
    National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should Know

    By Tony Lipiec, Greg Gosson

    "When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun

    Jan 1, 2010

  • SME
    High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft

    By T. Eggenberg

    Mechanization and automation of logistic equipment has become one of the main key factors in raising productivity and competitiveness especially for complex and larger mining or tunneling projects.

    Jan 1, 2010

  • NIOSH
    RI 9589 - Pipeline Treatment of a Copper-Zinc Waste Stream: A Pilot-Scale Evaluation

    By Craig C. Hustwit

    A pilot-scale treatment study was conducted on a copper-zinc bearing metal mine drainage using a pipeline treatment system called the In-Line System (ILS). The objective of this U.S. Bureau of Mines s

    Jan 1, 2010

  • SME-ICGCM
    Review and Estimation of the Hydraulic Conductivity of the Overburden above Longwall Panels. Experience from Australia

    By Winton Gale

    "The aim of this paper is to summarise the results and conclusions of Australian Coal Association Research Project (ACARP) Report Cl3013 which relate to water inflows into a mine which occur through t

    Jan 1, 2010

  • NIOSH
    RI 9363 - Mine Fire Diagnostics and Implementation of Water Injection With Fume Exhaustion at Renton, PA

    By Louis E. Dalverny

    U.S. Bureau of Mines research to develop diagnostic methods to locate and evaluate fires in abandoned mines and waste banks and techniques to extinguish such fires was applied to an abandoned 60-acre

    Jan 1, 2010