Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
DC Water First Street Tunnel – Integrated Engineering and ConstructionBy Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda
"INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob
Jan 1, 2016
-
Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case HistoriesBy Michael Gauna, Christopher Mark
"Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted
Jan 1, 2016
-
Temperature-Dependent Langmuir’s Model in the Coal and Methane Sorption Process: Statistics RelationshipBy N. Ripepi
"The Langmuir model has been widely used for the coal-methane sorption process via an isothermal test. However, even though the temperature-dependent Langmuir model were recognized theoretically and e
Jan 1, 2016
-
Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater TunnelBy Utku Gumus, Ertan Bostanci, Hanifi Copur, Ahmet Rüfai Bilgin, Ugur Altay
"Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are
Jan 1, 2016
-
Application of Huate® New Style Elutriation Electromagnetic Separator in Magnetite Beneficiation TechnonogyBy Shichang Liu, Hongli Jia, Zhaolian Wang, Maotang Liu, Ltd. Shandong Huate Magnet Technology Co., Fengliang Liu
"Introduce and promote a latest technology and equipment for magnetite. It’s featured of purifying concentrate, lowering tailing grade, high concentrate recovery rate and stable operation. HUATE® New
Jan 1, 2016
-
TBM Technology for an Australian Coal Drift: The Grosvenor ProjectBy Robert Marks, Enrico Dal Negro, Richard Schulkins
"In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th
Jan 1, 2016
-
Innovations and Breakthroughs in Mineral processing that have shaped the Existing Mining IndustryBy B. K. Gorain
"As mining has evolved over a century, so are the challenges associated with mining. Mining of complex ore bodies at greater depths is a major challenge requiring high capital and operating costs due
Jan 1, 2016
-
The Lee Tunnel Beckton London: An Innovative Use of FRC from Design to Construction PhaseBy John Greenhalgh, Benoit De Rivaz
"1.INTRODUCTIONThis paper is based on the Lee Tunnel project, which is part of the Thames Water’s Tideway Project.The client Thames Water has employed a Joint Venture of Morgan Sindall/Vinci Grand Pro
Jan 1, 2016
-
The “Big Picture” Approach to Surface MiningBy L. Widdifield, R. Riggle
"In today’s challenging mining environment the “Big Picture” (Caterpillar, 2013) approach to mining is often neglected. With haulage costs approaching up to 45 % of the overall mining costs, all too o
Jan 1, 2016
-
The Use of Oxygen Instead of Air in Bioleaching Operations at Medium TemperatureBy D. Ibarra, J. Jacob, A. G. Guezennec, P. d’Hugues, A. Archane
The lack of adequate gas mass transfer is a rate limiting step in many bacterial leaching processes. Oxygen often becomes a limiting factor because of its low solubility compared to the high demand in
Jan 1, 2016
-
The AMBS Flotation Process for Copper and Copper-Gold Ores: Bench to Plant ApplicationsBy B. K. Gorain
"The Air-Metabisulfite (AMBS) process has been developed to treat complex copper, molybdenum and precious metals (gold, silver) bearing ores using brackish and sea water. This process was able to prod
Jan 1, 2016
-
Geometallurgical Characterization of Drill Core Textural Patterns: A Case Study from the Mont-Wright Iron Ore DepositBy D. Michaud, C. Bazin, S. Lévesque, L. Pérez-Barnuevo, H. Longuepée
In recent years, with the emergence of Geometallurgy, a great effort has been made to characterize ore resources as early and accurately as possible, to allow better design and a more efficient operat
Jan 1, 2016
-
Modeling Capture Efficiency for a Flooded Bed Dust Scrubber Incorporated into a Longwall Shearer using a Small Scale Physical Model and CFDBy A. Jolly, A. R. Kumar, T. Novak
"Coal dust in an underground mining environment has always been a health and safety issue, especially with longwall faces. Efforts to integrate a flooded bed scrubber within a longwall shearer are und
Jan 1, 2016
-
Effects of Overburden Characteristics on Dynamic Failure in Underground Coal MiningBy Douglas Tesarik, Mark K. Larson, Habte Abraham, Heather E. Lawson
Dynamic failures, or "bumps", remain an imperative safety concern in underground coal mining, despite significant advancements in engineering controls. While many factors have been empirically linked
Jan 1, 2016
-
120 Years of Caisson Foundations in ChicagoBy Robert E. Schock, Eric J. Risberg
"Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which
Jan 1, 2016
-
Introduction to Rock Strength Borehole Probe (RSBP) for Estimation of Rock Strength in Roofbolt Drill HolesBy I. Sedat Buyuksagis, Jamal Rostami, Ali Naeimipour
"Improving the safety of underground openings and optimizing ground support systems requires reliable ground characterization. This includes understanding the joints, discontinuities, and rock strengt
Jan 1, 2016
-
Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel"The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide an
Jan 1, 2016
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM SolutionsBy Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016
-
Time-Dependent Deformations of Excavations and Tunnels in the Greater Toronto AreaBy Andrew Cushing, Joe Carvalho, Jon Hurt
"INTRODUCTIONThe shales of the Greater Toronto Area (GTA) have been known to experience time-dependent deformations (TDD); those initiated by excavation-induced stress relief which progress with time
Jan 1, 2016
-
Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing GroundBy R. Schuerch, G. Anagnostou, R. Poggiati
"The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters
Jan 1, 2016