Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel

Society for Mining, Metallurgy & Exploration
Utku Gumus Ugur Altay Ahmet Rüfai Bilgin Ertan Bostanci Hanifi Copur
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
843 KB
Publication Date:
Jan 1, 2016

Abstract

"Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are summarized. Cutter life is correlated to rock’s uniaxial compressive strength and Cerchar abrasivity index, and TBM operational parameters. Number of cutter replacements, average cutter replacement rates and types of cutter damages are summarized. The relationships between cutter life and rock properties and TBM operational parameters are analyzed by single variable regression method. Detailed analysis between chainages 1+200 and 1+982 km indicates that average cutter consumption rate is 35.7 m3/replacement (4.6 m/replacement). Cerchar abrasivity index and uniaxial compressive strength does not indicate any meaningful relationship with cutter life. Penetration per revolution and field specific energy might be used for predicting lives of constant cross-section double disc cutters. However, additional data is required to generalize the findings of this study. INTRODUCTION Cutter life / replacement and/or consumption rates in terms of cutter cost and replacement time loses is one of the most important parameters affecting excavation performance of mechanical excavators, especially of TBMs used very widely and equipped with usually disc cutters. Predicting cutter cost is a very important task in especially feasibility stage of tunneling projects. Basic parameters affecting cutter life can be classified into 3 general groups as geological and geotechnical, excavation machine (TBM) related, and operational parameters (Bilgin et al., 2013). The geological and geotechnical parameters are the most dominant ones among them. The machine related parameters should be arranged in accordance with the expected geological and geotechnical conditions for the best TBM excavation performance and minimum cost."
Citation

APA: Utku Gumus Ugur Altay Ahmet Rüfai Bilgin Ertan Bostanci Hanifi Copur  (2016)  Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel

MLA: Utku Gumus Ugur Altay Ahmet Rüfai Bilgin Ertan Bostanci Hanifi Copur Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel. Society for Mining, Metallurgy & Exploration, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account