    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024

  • SME
    Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024

    By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote

    On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun

    Jun 23, 2024

  • SME
    Surface Water Supply Project—Segment B3 Long Tunnel— Houston, TX - NAT2024

    By Sergio Flores, Nate Long, William Hodder, Phil Rhodes, Tim McQueary

    The Surface Water Supply Project Segment B3 is a 4 miles section of tunnel that will run East- West in Houston TX, from Hopper St to I-45. The tunnel will be mined by using a 128" Dia refurbished 1987

    Jun 23, 2024

  • SME
    Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024

    By Joan Carles Casado Ortega, Mitchell Gerdtau, Sandeep Pyakurel, Eric Crocker, Frank Perrone

    The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal

    Jun 23, 2024

  • SME
    Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024

    By Andrew Chegwidden, Tara Wilk

    Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m

    Jun 23, 2024

  • SME
    Contractual Practice in SEM/ NATM—Tunnelling in Austria and Germany - NAT2024

    By Lukas Erkurt, Wolfgang Holzer, Stefan Auderer, Richard Gradnik

    SEM/ NATM Tunnelling contracts in Austria and Germany are usually tendered applying unit price contracts. The purpose of this paper is to show how contractual problems are resolved in these countries.

    Jun 23, 2024

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • SME
    Tunnel Belt Applications for Long Distance Tunnels with Curvy Alignments - NAT2024

    By Marco Sonnenschein

    Belt conveyors for tunnelling are industry standard and key to high performance of TBM drives. Conveyors reduce traffic in the tunnel and increase safety in the tunnelling process. This paper will ill

    Jun 23, 2024

  • SME
    Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024

    By A. Bhargava, V. Nasri

    Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane

    Jun 23, 2024

  • SME
    Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024

    By Joseph Sopko, Xavier Lacourse-Dontigny

    For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th

    Jun 23, 2024

  • SME
    Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024

    By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft

    Jun 23, 2024

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    Parallel Thimble Shoal Tunnel: Challenging TBM Assembly and Launching in an Existing Island - NAT2024

    By Ruben Piqueras, Juan Luis Magro, Jorge Vázquez, Santiago Martínez, Xavier Manjarín

    The Parallel Thimble Shoal Tunnel project involves the construction of a bored tunnel under Thimble Shoal Channel in Chesapeake Bay (VA), between two artificial islands and parallel to the existing tu

    Jun 23, 2024

  • SME
    Unique Aspects of Remote High Altitude Water Tunnel Repair - NAT2024

    By David Jurich, Ed Perko, Jacob Prezkuta

    Numerous Colorado mountain tunnels that date to the late 1800s convey water to the farming and urban communities of the eastern Front Range. Repairs to these remote facilities, often located in public

    Jun 23, 2024

  • AUSIMM
    In situ observation of phase transition of silico-ferrite of calcium and aluminium

    By H Kim, J Park, J Lee

    Silico-ferrite of calcium and aluminium (SFCA) is a bonding phase in the iron ore sinter. The phase transition upon melting of SFCA was investigated with Differential Scanning Calorimetry and Confocal

    Jun 19, 2024

  • AUSIMM
    Effect of liquefaction controlling components in carbon-free mould powder for the continuous casting of ultra-low carbon steels

    By N Gruber

    In the continuous casting of ultralow carbon (ULC) steels, free carbon is used to control the melting behaviour of mould powders. If the carbon is not completely removed during melting, it is enriched

    Jun 19, 2024

  • AUSIMM
    Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI input

    By S K. Panda, M A. Van Ende, S Chatterjee

    Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu

    Jun 19, 2024

  • AUSIMM
    Solubility of nitrogen and inclusion characteristics in high aluminium steels

    By M M. Pande, M Ishfaq

    The effect of aluminium on nitrogen solubility was investigated by equilibrating melt comprising master alloy of Fe-Al with pure electrolytic iron in a controlled atmosphere (pure argon) at 1873 K. Ni

    Jun 19, 2024

  • AUSIMM
    Flux smelting behaviour of pre-reduced Mn ore by hydrogen at elevated temperatures

    By P Kumar, J Safarian

    Understanding how ore interacts with flux particles at elevated temperatures to create molten slag is crucial since it governs the dynamics of a chemical reaction. This study explores the smelting beh

    Jun 19, 2024

  • AUSIMM
    Effect of mill-scale and calcined dolomite on high Al2O3 sinter and its reduction behaviour

    By S J. Kim, S W. Kim, L Tomas da Rocha, S Jung

    Al2O3 has been regarded as a harmful gangue component in iron ore, especially causing reduction degradation in industrial sintering of iron ore. The current study aimed to utilise low-grade iron ore c

    Jun 19, 2024