    Pilbara creek diversions – resilience gained through increased ore recovery and an integrated approach to design

    By M Rafty, A Markham, S Atkinson, M Heyting

    Over recent years there has been a significant increase in the number of miners in the Pilbara region of Western Australia targeting channel iron deposits (CID) located in valleys, intersected by ephe

    Jul 24, 2017

  • DFI
    Pile Design And Construction Challenges In Partially Thawed Alaskan Soils

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas

  • DFI
    Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask

    Jan 1, 2017

  • DFI
    Pile Design Philosophies For Coralline And Weak Carbonate Rocks

    By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar

    Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks

    Sep 1, 2022

  • DFI
    Pile Design Using Cpt Results: The “Lpc Method”

    By Frederic A. Verheyde

    The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in

    Nov 1, 2022

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Pile Driving Dilemma: Reducing Noise, Vibrations

    By Michael D. Justason

    "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de

    Jan 1, 2012

  • DFI
    Pile Driving Hammers In Centrifuge Modelling - Synopsis

    By Daniel Levacher

    Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install

    Jan 1, 1996

  • DFI
    Pile Foundation Response to Ground Vibration from Rock Blasting

    By Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui

    "Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign

    Jan 1, 1900

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900

  • DFI
    Pile Foundations For Algiers New Airport Terminal

    By Ramdane Bahar

    The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea

    Jan 1, 2002

  • DFI
    Pile Foundations for the San Francisco 49ers NFL Stadium

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7

    Jan 1, 2014

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction

    By Garland Likins

    The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t

    Jan 1, 1998

  • DFI
    Pile Integrity Testing In The Netherlands

    By Peter Middendorp

    Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int

    Jan 1, 2006

  • DFI
    Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical Island

    By Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni

    This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b

    Sep 8, 2021

  • DFI
    Pile Load Test Results For Highway 280 Pile Uplift Test Site

    By Douglas Brittsan

    This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar

    Jan 1, 1993

  • DFI
    Pile Load Testing in New York City

    By Joel Moskowitz, Jan Cermak

    "New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o

    Jan 1, 2005

  • DFI
    Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, Alaska

    By Mohammed Sakr

    The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development

    Jan 1, 2009