Pile Load Test Results For Highway 280 Pile Uplift Test Site

- Organization:
- Deep Foundations Institute
- Pages:
- 171
- File Size:
- 5695 KB
- Publication Date:
- Jan 1, 1993
Abstract
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Department of Transportation (Caltrans), Federal Highways Administration (FHWA), and a group of pile manufacturers and construction firms. The participating manufacturers included Fundex, Halliburton, Monotube, and Nicholson, with each firm supplying proprietary pile systems. The field test program measured and will allow the direct comparison of the tensile and compressive capacity of nine common and proprietary pile systems installed in nearly identical soil conditions. Data reported here-in details pile compression and tensile load-deformation measured at the pile head. Cursory data regarding pile installation details are included to aid in data interpretation.
Citation
APA:
(1993) Pile Load Test Results For Highway 280 Pile Uplift Test SiteMLA: Pile Load Test Results For Highway 280 Pile Uplift Test Site. Deep Foundations Institute, 1993.