Search Documents

Sort by

  • ISEE
    Optimization of Fragmentation in benches for Dragline deployed in large opencast coal mines- A case study of Indian mine

    By Rajesh Sonkar, Sanjeev Kumar

    The deployment of Dragline machines in opencast coal projects involves huge capital expenditure as well as operating costs. The mine operators always endeavor to ensure smooth excavation of material b

    Jan 1, 2011

  • SME
    Optimization Of Grade Control Sampling Based On Conditional Simulation

    Conditional simulation provides a model of the ore body that represents variability in the data. This can be used to determine the impact of various grade control and mining strategies. A number of tr

    Jan 1, 1999

  • SAIMM
    Optimization Of Mechanized Mining Layout Within Anglo American Platinum

    By P. Valicek

    Anglo American Platinum Limited is constantly striving to improve safety and productivity. There are many different initiatives taking place within the organization in order to ensure continued safe

    Jan 1, 2012

  • TMS
    Optimization Of Metallurgical Processes Using High Rate Biotechnology

    By Henk Dijkman

    Existing metallurgical operations can be optimized by implementing engineered bioreactor systems in the process configuration. For instance, metals can be recovered safely and economically from proces

    Jan 1, 2002

  • IMPC
    Optimization of Plant Performance at North American Palladium’s Lac Des Iles Mill Using Integrated Metallurgical and Mineralogical (Qemscan) Testing

    By Chris J. Martin, Nichola A. McKay

    "In mid-2001, North American Palladium commissioned a new 15,000 tonnes per day milling and flotation circuit at their Lac des Iles Mine (LDI), one of only two primary platinum group element (PGE) pro

    Jan 1, 2003

  • SME
    Optimization Of Power For Off-Highway Haul Units

    By G. T. Lineberry

    Horsepower requirement is recognized as a most important equipment characteristic. Other critical equipment characteristics will be isolated and analyzed by traditional operations research techniques,

    Jan 1, 1984

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • SAIMM
    Optimization of shift cycles in the South African mining sector

    By J. Pelders, F. Magweregwede, S. M. Rupprecht

    Increased depths of conventional gold and platinum mines, longer travelling times as working places move further from the shaft, and ancillary activities taking place in the mining cycle reduce the us

    Aug 1, 2021

  • SME
    Optimization Of Single And Multiple Seam Dragline Mines Through Simulation

    By Ronny J. Sadri

    Under contract to the Department of Energy, Fluor Mining & Metals, Inc. and Bonner & Moore Associates developed a group of computer models that can be used to simulate single seam dragline operations.

    Jan 1, 1982

  • SME
    Optimization of surface mining dig limits with a practical heuristic algorithm

    By Y. V. Vasylchuk

    An algorithm is presented for optimizing the classification of surface mine material subject to excavating constraints. High-resolution, expected-profit models are optimized to classification maps sub

  • SME
    Optimization of Surface Mining Dig Limits with a PracticalHeuristic Algorithm Mining, Metallurgy and Exploration

    By Y. V. Vasylchuk

    This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif

  • TMS
    Optimization Of The Asarco East Helena Water Treatment Plant For Removing Arsenic And Metals

    By Douglas K. Modrow

    In the fall of 1993, construction was completed on a state of the art industrial waste water treatment plant at Asarco's East Helena Lead Smelter. Purpose of the plant was to remove arsenic and m

    Jan 1, 1996

  • SAIMM
    Optimization of the Cycle Time to Increase Productivity at Ruashi Mining

    By H. Thomas, I. N. M. Nday

    "*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj

    Jul 1, 2019

  • CIM
    Optimization of the Damang Mine

    By Charles Amoah

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Optimization of the Operation of Hot Stoves

    By Henrik Saxén, Mikko Helle

    The operation of hot stoves used for preheating the blast in the ironmaking blast furnace has a strong effect on the consumption of reductants, economic performance of and CO2 emissions from the steel

    Jan 1, 2015

  • SME-ICGCM
    Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal Mining

    By Shosei Serata

    The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe

    Jan 1, 1986

  • SME
    Optimization of Through-The-Earth Radio Communications via Mine Overburden Conductivity Estimation

    By M. Ralchenko, C. Samson, M. Svilans, C. Walsh

    "Through-the-Earth (TTE) radio has been proposed as a means of emergency communications in mines. The propagation of a TTE radio signal depends chiefly on the subsurface conductivity distribution. Rob

    Jan 7, 2018

  • SME
    Optimization of Trackless Equipment Scheduling in Underground Mines Using Genetic Algorithms "Mining, Metallurgy & Exploration (2020)

    By Guoqing Li, Hao Wang, Nailian Hu, Victor Tenorio, Jie Hou

    This paper presents an algorithm for optimizing the scheduling of trackless equipment in underground mines. With the shortest working interval and maximum productivity as goals, a genetic algorithm (G

    Aug 12, 2020

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • SME
    Optimization of ventilation and cooling systems at Sunshine mine's Kellogg operation

    By R. S. Jurani

    Sunshine Mining Co.'s Kellogg operation is the primary silver producer in the US. Maintaining a comfortable working environment in this deep underground mine historically has been a complex and c

    Jan 1, 1988