Optimization of the Damang Mine

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 14
- File Size:
- 320 KB
- Publication Date:
- Jan 1, 2012
Abstract
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph when treating primary crushed primary ore, and was increased to above 600 tph with partially crushed primary ore. Abosso Goldfields engaged Orway Mineral Consultants (OMC) to assist with the optimization process in 2009 and the two companies have been working together since, to further refine the process. Continuous improvement was achieved through crushing circuit modifications, changes in operating processes and grinding control system utilization. This paper discusses the improvements developed for the increase in milling capacity and improvements in final product size.
Citation
APA:
(2012) Optimization of the Damang MineMLA: Optimization of the Damang Mine. Canadian Institute of Mining, Metallurgy and Petroleum, 2012.