  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida

    By Gregory A. Stephan

    A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi

    Jan 1, 1999

  • DFI
    Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis

    By Anupam Saxena

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U

    Jan 1, 1996

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • AUSIMM
    Designer Tailings – An Integrated Model for Tailings Management

    By T Baumgartl, T Huynh, K Tungpalan, E Wightman, M Edraki, M Tayebi-Khorami, L Huang, S Palaniandy, E Manlapig

    With the increasing rate of tailing production worldwide there is a growing concern about the hazards of tailings storage facilities (TSF). Past and current mining, processing and waste disposal strat

    Jul 16, 2014

  • TMS
    Designing a Collaborative System for Socio-Environmental Management of Industrial Waste

    By F. Baldini, M. S. Borges

    "The proposed method emphasizes the optimization of waste management with regard to the exploitation of raw materials incorporated in the remains of industry, as well as the economics of natural resou

    Jan 1, 2011

  • SME
    Designing a Geostatistical-Based U-Spatial Statistics Algorithm for the Separation of the Anomaly Area: Application at Baghqloom Porphyry Copper System, Southeastern Iran - Mining, Metallurgy & Exploration (2021)

    By Omid Asghari, Seyed Reza Ghavami-Riabi, Sajjad Talesh Hosseini

    Separation of geochemical anomalies from the background using various methods for identifying areas of higher mineral potential is a critical first step in Greenfield and Brownfield programs. There ar

    May 3, 2021

  • SME
    Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024

    By Sean Warren, JOSEF BOURGEOIS

    The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute

    Feb 1, 2024

  • AUSIMM
    Designing a versatile, multimodal mine IoT system for accident prevention and emergency management in mines

    By D Zielinski-Nicolson

    The emergence of affordable, portable and versatile wireless devices has enabled a new frontier in mine safety equipment. Existing solutions provide methods for tracking personnel and assets in underg

    May 5, 2022

  • SME
    Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction Methods

    By Matthew Anderson, David Day, Paul Smith

    "The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me

    Jan 1, 2016

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • CIM
    Designing and developing an integrated cave management system

    By A. van As, J. McGaughey, M. J. Mol, R. Tosen

    Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la

    Jan 1, 2014

  • SME
    Designing and modeling mesh communications in underground coal mines

    By Michael E. Karmis

    New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer

    Jun 1, 2010

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AIME
    Designing For Tailing Disposal In The Southwest

    By E. V. Given

    Designing a tailing dam is a major step toward fully integrated mill operation. In the case of large concentrators considerable planning is necessary, and the site of the tailing disposal area may ver

    Jan 7, 1959

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • SME
    Designing Leach Pad Liners For Differential Settlement

    By T. V. Ramey

    Heap leaching in certain parts of the world, such as Chile's Atacama Desert, brings unique design problems in the form of possible large differential settlements of the foundation soils due to th

    Jan 1, 1997