Avoiding Environmental, Health, and Safety Culture KillersBy T. A. Laser
"INTRODUCTION A positive workplace environmental, health, and safety (EHS) culture affords organizations and corporations many benefits, including increased trust and employee morale, sustainable EHS
Jan 1, 2018
-
Avoiding Karst by Getting Under It - Jefferson Barracks Tunnel, St. LouisBy Patricia Pride, Kurt Bettger, Jack Raymer
"INTRODUCTION The Jefferson Barracks Tunnel is in the final stages of design and is expected to go out to bid in the summer of 2016. The project is located in south St. Louis County along the west ban
Jan 1, 2016
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Axial Capacities Of Drilled Displacement Piles Predicted By Spt And Cpt Based MethodsBy Sam Warren, Antonio Marinucci, Genesis Z. Figueroa, Anne Lemnitzer
Drilled Displacement Piles (DDP) provide an ideal deep foundation solution that combines the benefits of ground improvement with traditional advantages of piling systems. This paper consolidates data
May 1, 2022
-
Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay BridgeBy Jacob Chacko
The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new
Jan 1, 2002
-
B.P. Selco - Hope Brook Project Pilot Heap Leach ProgramBy W. J. Witte, M. K. Witte
"INTRODUCTION A pilot heap leach project was conducted on the B. P. Selco Hope Brook ore located in southwestern Newfoundland. The pilot heap leach was undertaken to assess and confirm the following:1
Jan 1, 1987
-
Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case StudyBy Prasanta Paul, Aminul Islam
"Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos
Jan 1, 2015
-
Back Analysis of High Tunnel Convergences in Clayey MarlsBy Fabiola Espinoza Carmona, Elena Chiriotti, Edoardo Misano
"INTRODUCTION Ganntas Tunnel is part of the modernization project of the railway between Alger and Oran, in Algeria. In order to double and rectify the existing line between El Affroun and Khémis Mili
Jan 1, 2016
-
Back Analysis Of Plane And Wedge Rock Slope Failures Using Microcomputer ProgramsBy E. M. Frizzell
This paper addresses the use of the microcomputer programs BACKONE and BACKWEDG for an estimation of rock mass strength characteristics by back analysis of plane and wedge failures. The artificial sup
Jan 1, 1988
-
Back Analysis of the West Wall Slope Failure at Lab Chrysotile MineBy Philippe Caudal
This paper presents a case study in which a slope failure was observed on the west wall of the LAB Chrysotile mine in the vicinity of the main ramp in January 2010. Airborne LiDAR results were used to
Aug 1, 2013
-
Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case StudiesBy Jerry Ran
Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin
May 1, 2004
-
Back on Track: The Downtown Rail Extension - RETC2021By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Back To Basics - The Road to Recovery: Milling Practice at Brunswick MiningBy R. J. Grant, D. W. Scott, M. A. Cooper, E. R. Shannon
"The Brunswick No.12 site concentrator processes 10,500 tonnes per day of a complex lead, zinc, copper and silver ore producing four concentrates by differential flotation. Research over the years has
Jan 1, 1993
-
Back to the Basics; Nonelectric Initiation Shock Tube Systems Part 2: Safety ConsiderationsBy Larry Schneider
"0 ne of the incentives that led to the development of non-electric shock tube initiation systems was the desire within the industry to improve detonator safety. And to the extent that nonelectric ini
Jan 1, 1995
-
Back to the futureBy G W. Clamp
The most traum atic event within the lUK coal industry during the last 30 years was its privatisation. Who were the relatively unknown people from RJB: white knights or robber barons? This paper highl
Jan 8, 1997
-
Back to the Future - Why Change Doesn't Necessarily Mean ProgressBy P A. Tilyard
There have been enormous changes in mineral processing in the past four decades. For example grinding mill power has increased by an order of magnitude, regrinding is done to -10 microns and flotation
Jan 1, 2009
-
Back-Analyses of Failures and Support Redesign of a Magnesite Roomand-Pillar Mine Excavated in Stratified RockBy J. Arzúa, L. R. Alejano, P. Rodríguez
"After six years of successful excavation with a support pattern, some roof failures have happened in a room-and-pillar underground mine excavated in a stratified rock mass. In this paper the authors
Jan 1, 2015
-
Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)By D. Kump
The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.
Jan 1, 1999
-
Backfill Optimization and in-House Shotcrete Production at the Cluff Lake MineBy Jamel Sgaoula
During 1998 COGEMA Resources Inc. announced that operations at the Cluff Lake mine will be suspended indefinitely by the end of year 2000 as a result of deteriorating uranium market conditions. To rem
May 1, 2001