Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Two Dimensional Numerical Simulation of Fault Reactivation and Induced SeismicityBy R. R. Song, Q. Li, H. Xing, X. C. Wei
Geomechanical modelling of fault stability is an important part of CO2 capture and storage (CCS) research program to ensure its viability and long-term safety. Storage of CO2 in deep subsurface reserv
Jan 1, 2015
-
Two Steps Forward and One Step Back: A Case of Arrested Development in Laterite ProcessingBy Larry M. Southwick
Considerable process and equipment development and analysis were conducted during design of Freeport Sulfur's laterite nickel facilities in the late 1950's. These covered ore concentration a
Jan 1, 2004
-
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar
The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat
Jun 13, 2021
-
Two-Dimensional Finite Difference Calculations Of Dynamic In-Situ Response Of Layered Geologic Media To A Large Explosive LoadBy Howard R. Pratt, Jimmie L. Bratton
The Air Force Weapons Laboratory (AFWL) has been carrying out a series of experiments whose principal purpose is to measure the dynamic response of rock media to large pressure pulses. Coupled with th
Jan 1, 1972
-
Two-Dimensional, Evaporative Flux Cover/Cap Analysis for Prevention of Acid Mine DrainageBy J Krahn
In designing climate exposed soil structures such as caps and covers over mine waste it is necessary to include the wetting and drying influences of the local climate in order to accurately predict th
Jan 1, 2003
-
Two-Phase Predictive Finite-Element Flow Model for Semi-Solid SlurriesBy Frederic Pineau
Semisolid metal alloys have a special microstructure of globular grains suspended in a liquid metal matrix. This particular physical state of the matter can be exploited to produce near-net- shape par
Jan 1, 2001
-
Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa ProjectBy J. A. Brown, F. P. Kerr, M. A. Archer
Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach
Jan 1, 2020
-
Two-Stage Program Boosts Pima To 30,000 TPDBy George A. Komadina
From its modest beginning in 1957 with one mill grinding section handling 3000 tpd Pima has steadily expanded. In July 1966, work was completed that allowed the concentrator to treat in excess of 18,0
Jan 11, 1967
-
Two-Stage Treatment of High Arsenic Synthetic Mine Water at Cold TemperatureBy A. L. Mackie
Arsenic is a highly toxic element and a known human carcinogen. It is often a contaminant in mine water discharges, particularly from gold mining and roasting operations, and has been found at concent
Aug 1, 2013
-
Tyndalloscope Experiences Under Mine Working ConditionsBy R. B. Fermor
"The tyndalloscope is used in Europe for dust-hazard assessments in both coal and metal mines. Dust-hazard conditions can be directly evaluated by the tyndalloscope in many underground working situati
Jan 1, 1970
-
Typical And Atypical Slug Test Responses Observed In Mine SpoilBy J. W. Hawkins
Understanding aquifer properties in surface mine backfill is essential for managing the groundwater flow system as well as controlling the formation and discharge of acid urine drainage. Slug tests (i
Jan 1, 1994
-
Typical Copper Oxide Ore Leaching OperationsBy Thomas D. Henderson, Wayne R. Hopkins, Arthur Lynch
Brought on stream in 1975, the 10,000-tpd copper oxide processing plant of Anamax Mining Co. at Twin Buttes, Ariz., is now at design capacity. Based on acid agitation leaching, solvent ion exchange, a
Jan 1, 1985
-
U. S. Borax: Still Mining Borates After 131 YearsBy Steve Kral
Borates are minerals that contain boron. Trace amounts exist in rocks, soil, water and people. Boron-containing ores are rare and U.S. Borax, a subsidiary of Rio Tinto Borax, controls one of the wor
Jan 1, 2003
-
U.S. Bureau Of Mines Small-Scale Arc Melter Tests On Simulated Low-Level Radioactive WastesBy W. K. Connor, O&apos
The U.S. Bureau of Mines, in cooperation with the Idaho National Engineering Laboratory (INEL), conducted over 30 hours of melting tests to vitrify simulated low-level radioactive wastes from the INEL
Jan 1, 1994
-
U.S. Department of Energy's Mine Roof Simulator: Performance Evaluation of Longwall Roof SupportsBy Fuad S. Maayeh, Robert J. Evans, Paul M. Yavorsky
A description and capabilities of the Mine Roof Simulator at the Pittsburgh Mining Technology Center is illustrated for testing longwall roof support equipment. This unique Mine Roof Simulator has the
Jan 1, 1982
-
U.S. Gypsum Takes An Unusual Deposit And Develops . . . The Locust Cove MineBy Frank C. Appleyard
Southwest of the town of Saltville in western Virginia is Plasterco, a small village that has been a source of gypsum production since 1815. Boasting the deepest underground gypsum mine in the world,
Jan 3, 1965
-
U.S. Zeolites, Inc. An Exciting Emerging CompanyBy G. C. Presley
With plant construction scheduled for the Spring of 1997, U. S. Zeolites will become the new source for quality in natural zeolites. The company will selectively mine, dry process, package, and market
Jan 1, 1997
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
UG2 pillar strength: Verification of the PlatMine formulaBy B. P. Watson, A. Carpede, W. O. Kekana, N. Fernandes, W. Theron, M. P. Mahlangu, G. Betz
The research described in this paper was done to confirm the Upper Group 2 (UG2) PlatMine peak pillar strength formula (Watson et al., 2007), which was determined from a back-analysis of failed and un
Aug 1, 2021
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009