Search Documents

Sort by

  • SME
    Site investigations and geotechnical assessment for the construction of the deep underground science and engineering laboratory at the former Homestake Mine - SME Transactions 2011

    By W. Roggenthen, Z. J. Hladysz, G. D. Callahan, W. G. Pariseau, W. Weinig, C. Randolph-Loar, R. Popielak

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, SD, under the sponsorship of the U.S. National Science Foundation

    Jan 1, 2011

  • SME
    Site Investigations And Mined Tunnel Costs--Comparisons And Conclusions

    By Charles W. Daugherty, Eugene B. Waggoner

    In the construction of recent subsurface projects, particularly mined openings and transit systems, it has been apparent that final costs were often greater than first expected. Because many overruns

    Jan 1, 1985

  • SME
    Site Investigations For Large Diameter Drilled Shafts

    By Donald P. Richards, William M. Greenslade, Daniel E. Albers

    INTRODUCTION The application of oil field technology to large diameter hole drilling is beginning to offer a cost effective alternative to conventional shaft sinking methods. The drilling of ventil

    Jan 1, 1981

  • SME
    Site Investigations Over Abandoned Underground Mines ? Summary

    By Robert M. Cox

    A thorough geological engineering investigation is required before surface lands overlying abandoned underground mines can be safely recommended as building sites. The major problems confronting the g

    Jan 1, 1975

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • SME
    Site planning process : Application to land use potential evaluation for mined land (Technical Paper)

    By R. J. Sweigard, R. V. Ramani

    Productive and beneficial use of reclaimed surface-mined land is a concern of industry, government, and the general public. A process has been developed that will aid mine planners and public planners

    Jan 1, 1987

  • ISEE
    Site Procedures for a Blast Vibration Program and Impact Assessment

    By David E. Siskind

    "This report describes recommended vibration monitoring and assessment practices at blasting sites.Intended is regular monitoring, tracking of trends, responding to complaints of alleged damage, and t

    Jan 1, 1999

  • CIM
    Site Selection

    By Rob Boom, Yasuyuki Tozaki, Frank M. Wheeler

    Selection of a suitable site for a metallurgical plant is crucial for the success of the business case. For a brownfield project, with the decision to locate the project on a site with existing produc

    Jan 1, 2015

  • SME
    Site Selection And Environmental Analysis Of Coal Gasification Plants

    By Sheridan A. Glen

    As the Federal government along with individual states continue to grapple with the job of refining a comprehensive energy policy, coal continually stands out as an energy source which heralds a combi

    Jan 1, 1977

  • SME
    Site Selection And Licensing Of Mined Geologic Repositories For Disposal Of High-Level Radioactive Wastes ? Introduction

    By M. Kehnemuyi

    The U.S. Department of Energy is charged, by federal law, with the responsibility for developing and implementing programs for long- term storage and terminal disposal of high- level radioactive waste

    Jan 1, 1981

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000

  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • ISEE
    Site Specific Blasting Model Using Schmidt Tensile Strength and Image Analysis

    By K. M. Kim, J. B. Kemeny

    A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main

    Jan 1, 2011

  • DFI
    Site Specific Study for Foundation Design of Iswar Gupta Bridge

    By Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath

    "Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig

    Jan 1, 2015

  • TMS
    Site Specificity Of Heavy Metal Adsorption On Goethite

    By KNona C. Liddell

    Goethite is an important naturally occurring sorbent for divalent heavy metals and has often been used as a model compound in studies of adsorption on oxide mineral surfaces. Surface complexation mode

    Jan 1, 1999

  • SME
    Site Testing For Large Volumes Of Deep Space

    By R. L. Loofbourow, Robert R. Miller

    Deep, stable, unlined space promises secure, efficient, acceptable solutions to several current problems. With truly favorable conditions, it can be economic as well. The basic requirement is suffi

    Jan 1, 1981

  • SME
    Site Testing Of Shafts, Tunnels And Caverns; The Pregrouting Of Excavations With Special Reference To South African Conditions.

    By Norman D. Harte, George W. Holl

    The development of the most important tool used in Site Testing is reviewed briefly and the application of the information gained is described. The operation of Site Testing and pregrouting of undergr

    Jan 1, 1981

  • AUSIMM
    Site Water Balance Response to Variable Climatic Conditions

    By S Hawker, M Gibbs, A Craven

    Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary

    Nov 26, 2013

  • IMMS
    Site-banking of the Reserved Areas with the International Seabed Authority: for operation of the Enterprise or Joint Venture

    By Kioshi Mishiro, Pratima Jauhari, Walter Williams

    INTRODUCTION The UN-General Assembly adopted an Agreement on 28 July 1994 entitled ‘Agreement relating to the implementation of Part XI of the United Nations Convention on the Law of the Sea ((UNCLOS)

    Jan 1, 2018

  • SME
    Site-specific blasting model for mine-to-mill optimization - SME Transactions 2011

    By J. Kemeny, K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011