Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
VIMS Telemetry SystemBy C. S. Wageman
Staying competitive in the highly aggressive Powder River Basin is a challenge facing all operators. Any advantage that a mine utilizes to improve productivity and reduce costs could mean the differen
Jan 1, 1996
-
Coal Mining in Ruhr Germany: An American Perspective of an Industry in TransitionBy Jürgen Kretschmann, Christina Suarez, Jürgen Brune, Stefan Möllerherm
"The Ruhr region in Germany’s North-Rhine Westphalia is going through significant change. By the end of 2018, the last two underground hard coal mines in the Ruhr, Ibbenbüren and Prosper-Haniel collie
Mar 1, 2019
-
An Intelligent Task Control System For Dynamic Mining EnvironmentsAutomation and robotics are the keys to new intelligent autonomous mining systems which can remove operators from the hazardous and stressful mining environment and provide the tools for greater produ
Jan 1, 1994
-
Utilization of Citric Acid to Improve the Depressive Efficiency of Sodium Silicate on the Flotation of Calcite and FluoriteBy Jie Zhang, Xi Zhang, Yu Wang, Wei Zhao
The study proposes a novel reagent scheme where adding a small amount of citric acid (CA) significantly improves the depression effect of sodium silicate on calcite and fluorite. The flotation results
Mar 27, 2022
-
Mobile Solid-State Lidar for Construction Quality Assurance - RETC2023By Adam Saylor, Travis A. Shoemaker, Steve Miller
Lidar scanning has become an increasingly popular tool for documenting underground excavations; however, high costs of traditional mechanical electrical lidar hardware, software, and training have lim
Jun 13, 2023
-
Evaluating the Tradeoffs Between Microtunnelling and Tunnel Boring Machines for Small Diameter Tunnels—A Case Study of the Ferry Road and Riverbend Combined Sewer Relief Project - RETC2023By Dani Delaloye, Kas Zurek
Evaluating and selecting the appropriate excavation method is a key to the success of any tunnelling project. The benefits and risks of different methods should be well understood by the designer and
Jun 13, 2023
-
Application of impact-resistant steel sets for underground roof fall rehabilitation - SME Transactions 2011By J. C. Stankus, K. J. Ma, D. Faulkner
To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding-type c
Jan 1, 2011
-
Impacts Of Land Use Planning On Mineral ResourcesBy R. V. Ramani
Demands on available lands will continue to increase due to the projected increase in population and industrial expansion. Though there is an upper limit on the available lands, the multi-use nature o
Jan 1, 1982
-
Acid Mine Drainage Quantity And Quality Generation Model ? IntroductionBy Vincent T. Ricca
Acid mine drainage is a serious water pollution problem, for its contaminants will eventually effect the quality of the receiving streams. According to the Appalachian Regional Commission (1969)1, 10,
Jan 1, 1973
-
A Neuro‑numeric Approach for Flyrock Prediction and Safe Distances Definition - Mining, Metallurgy & Exploration (2021)By Dejan Petrović, Pavle Stojković, Jelena Ivaz, Saša Stojadinović
In spite of the fact that flyrock phenomenon represents the real threat for personnel and machinery, it still remains insufficiently investigated. There are efforts, in the mining community, to explai
Oct 22, 2021
-
The Characterization And Redesign. Of A Failing Highwall In Eastern KentuckyBy J. S. Martin
The redesign and reinforcement of a highwall located adjacent to a $10,000,000 shopping center, destabilized by active subsidence, was conducted after an extensive geotechnical investigation. The high
Jan 1, 1988
-
The impact of black lung and a methodology for controlling respirable dustBy Jay F. Colinet
Coal workers’ pneumoconiosis (CWP), commonly known as black lung, is caused by the inhalation of respirable coal mine dust and is a disabling and potentially fatal lung disease with no cure. Historica
-
Recent Developments In Pressure Oxidation Treatment For Cannon Mine Concentrates (f926b268-a2fb-44a4-ab56-05fb42aece50)By D. M. Larsen
Since start-up in 1985 the Cannon Mine has produced and shipped a 170 g Au/tonne (5 oz Au/ton) flotation concentrate to various smelters for gold and silver recovery. Several processed have been inves
Jan 1, 1993
-
Roof and Pillar Failure Associated with Weak Floor at a Limestone MineBy J. L. Ellenberger, T. Miller
"A limestone mine in Ohio has had roof instability problems that have led to massive roof falls extending to the surface. This paper describes a collaborative study of these events undertaken by the N
Jan 1, 2015
-
Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Real Time Psychrometric Data Collection (85c62861-ad3e-428a-b273-44d602c876b4)By K. H. McDaniel
Eight Mine Weather Stations (MWS) installed at the Waste Isolation Pilot Plant (WIPP) to monitor the underground ventilation system me helping to simulate real-time ventilation scenarios. Seasonal wea
Jan 1, 1997
-
Supaflo "High Compression" Thickening Optimizes Processing At Barrick's Goldstrike And Falconbridge Ltd's Kidd Metallurgical DivisionBy Mitchell Gordon
Two mineral processing facilities in North America required near terminal density slurries to perform de-bottle necking in their circuits. The installation at Barrick Goldstrike to ensure efficient ox
Jan 1, 1997
-
Closure Costs (Pay Me Now And Pay Me Later)By J. J. Antony
As the first wave of precious metal heap leach closures and reclamation projects occur, a number of companies are being hit with costly surprises. While this paper refers specifically to U.S precious
Jan 1, 1994
-
Alteration Mineralogy -A Powerful Tool For Precious Metals Exploration And Ore ControlPrecious metals exploration is increasingly involved with concealed, deeper-seated gold-silver deposits which exhibit considerably more challenges to the geologist than near-surface, oxidized ores. Th
Jan 1, 1993