Design Of An Underground Repository In The Unsaturated Zone
By R. F. Harig
Designing an underground nuclear waste repository is a complex process. Although many decisions are involved before the design is complete, the first three--what the target horizon is, what the underg
Jan 1, 1991
-
Respirable Dust Measured Downwind During Rock Dust Application
By M. L. Harris, J. Organiscak, S. Klima, I. E. Perera
"The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Mining Research Division (PMRD) conducted underground evaluations in an attempt to quantify respirable rock dust generatio
Jan 1, 2017
-
Improving Contracting Methods--The Owner's Viewpoint
By Sammie D. Guy
This paper discusses the subject of "Improving Contracting Methods" from the owners point of view, particularly the public. An overview is given of the work of the U.S. National Committee on Tunneling
Jan 1, 1983
-
Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024
By Joseph Goessling, Mark Kroncke, James Parkes
The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi
Jun 23, 2024
-
A New Electrolytic Alternative to Chemical Neutralization
By P. James
"INTRODUCTION Control of target stream pH is very important in leach mining and treatment of MIW (mining influenced water). On the production side, solution acidity can impact SX (solvent extraction)
Jan 1, 2015
-
Sulfate Reducing Bioreactor Treating Acidic Coal Mine Influenced Water (MIW) In Western Pennsylvania
By R. L. Eppley
The Blacklick Creek Watershed Association was awarded a $158,000 Growing Greener grant from the Pennsylvania Department of Environmental Protection in 2002 for the design and construction of a sulfate
Jan 1, 2010
-
Research Center Of Post-mining At Thga Bochum / Germany - SME Annual Meeting 2022
By J. Kretschmann, P. Goerke-Mallet, C. Melchers
Mining always leaves a mark behind. Dealing with this legacy is not only a tremendous challenge in Germany, but internationally too. The Technical University Georg Agricola (THGA) in Bochum, Germany,
Mar 2, 2022
-
Hazardous Substance/Waste Management Considerations Another Dimension To An Environmental Audit
By J. C. Mullen
Today, the coal mining industry is more knowledgeable on the potential negative economic consequences associated with improper management of hazardous substances and various types of solid waste. The
Jan 1, 1992
-
Mining and Environmental Educational Modules for Tribal Colleges
By K. Chief
American Indian lands contain a vast amount of renewable and non-renewable resources that have consequently been mined (Smith and Frehner). Therefore, it is understandable that tribes are concerned ab
Feb 23, 2014
-
Evaluation & Selection of Novel Surveying Systems for use in Surface Coal Mining
By T. Stack, C. Roos, M. Drake, P. Conrad
"This paper presents the evaluation Montana Tech completed for the Western Energy Company Rosebud Mine relating to the benefits of survey data collected using novel technologies over traditional metho
Jan 1, 2017
-
Reclaiming Steep-Slope Coal Mines In The Eastern US For Successful Reforestation
A methodology has been developed and demonstrated to be effective in reclaiming surface-mined land for a forestry post-mining land use. The forestry reclamation approach (FRA) has been applied, almost
Jan 1, 2011
-
"Minesite" A Basis For Mineral Resource Planning (Getting The Rock In The Box Isn't Like It Use To Be)
By David L. Brostrom, William C. Brice, Perry A. Canton
The business of mineral exploration and development has become much more than simply a problem of locating orebodies and designing mines. Favorable economic analysis of mining and processing feasibili
Jan 1, 1974
-
Nonconventional surface ground behavior induced by underground mining in Pennsylvania - SME Transactions 2015
By R. Gray, B. Hebblewhite
Experience from Australia had identified what is referred to as nonconventional surface subsidence behavior. This occurs under irregular surface topography, resulting in valley closure, valley floor u
Jan 1, 2015
-
Consol's Bailey Mine Complex: Avoiding Permitting And Compliance Problems Through Proper Planning And Design ? Introduction
By Jonathan M. Pachter
The Bailey mining complex is located in Greene County, PA in the valley of Talley Run, a small stream tributary to the Enlow Fork of Wheeling Creek as shown on the location map insert found on Figure
Jan 1, 1985
-
The Party’s Over, Now What? - SME Annual Meeting 2025
By Peter Werner
Technological advances in mine equipment and milling processes have enabled mining companies to exploit ever lower grades of ore. The result has been larger disturbances, greater volumes of waste, a c
Feb 1, 2025
-
Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021
By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell
Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro
Jun 13, 2021
-
Dual-Purpose Mine Land Rehabilitation: Integrating Environmental Restoration and Sustainable Use for Tourism and Agriculture in Cajamarca - SME Annual Meeting 2025
By F. Ysla, M. Mendoza
This proposal, based on the CIEMAN Cajamarca - Hualgayoc initiative, focuses on “Transforming Abandoned Mine Lands’’ We aim to study and assess the feasibility of an innovative rehabilitation method.
Feb 1, 2025
-
Hydrologic, Geologic And Geotechnical Aspects Of Long-Term Stability ? 1. Introduction
By John D. Nelson
Unprotected uranium mill tailings impoundments can pose a significant risk to nearby inhabitants and the surrounding environment in the event of a prolonged or catastrophic release of contaminants con
Jan 1, 1984
-
Ventilation Challenges During Construction of Emergency Galleries - Austria’s Longest Road Tunnel (14km) Receives a Significant Renovation
By Rainer Antretter
"THE CHALLENGE The 14km long, Arlbergtunnel, closed for public traffic during summer 2015, receiving a comprehensive and substantial renovation from 2015 to 2017. The main works discussed here, carrie
Jan 1, 2016
-
A New Approach To Determine The In-Situ Strength Of Coal In Mine Pillars
By Y. J. Zhang
This paper presents the results of a recent study on the development of an in-situ testing method for determining the coal strength in mine pillars. The strength testing is performed in the horizontal
Jan 1, 1995