Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characterization of Nanoparticles Generated from Drilling Activities within a MineBy M. Schreiner, J. Brune, D. Theisen, C. S. -J. Tsai
This study reports that routine mining activities could produce a high number of nanometer sized particles which have not been well characterized and may represent an unacknowledged exposure present i
Jan 1, 2019
-
Tracing Ground Water By Geophysical Methods ? IntroductionBy Roy J. Greenfield
A highly undesirable side effect of the mining of coal is the release of acid forming chemicals into the ground water system. The disturbance of the ground during mining allows water to flow through t
Jan 1, 1973
-
Manganese Oxide Coated-Media For Removal Of Soluble Manganese In Mine DrainageBy Felicia F. Peng
The naturally occurring aged manganese oxide coated on the granular media was found to have a catalytic effect on the removal of low concentration of Mn(II) (-1 ppm) from drinking water. Applying this
Jan 1, 1994
-
Solution Management During Decommissioning Of Heap Leach OperationsHeap leaching has become one of the prime technologies used for the recovery of precious metals from low-grade ores over the past ten years. The recovery process involves mining and stacking the ore o
Jan 1, 1992
-
Geology And Evaluation Of The Asbestos Hill OrebodyBy R. V. Stewart
This chrysotile asbestos orebody is located near the northern tip of the Province of Quebec, Canada. It is some 1818 km (1130 mi) north of Montreal; 480 km (300 mi) north of the tree line and is situa
Jan 1, 1978
-
Accelerated Rehabilitation of the White Rock Tunnel - RECT2021By Nathan Bowersox, Zuzana Skovajsova, David M. Jurich, Brian Harris
When unwatered after more than 50 years of operation, the White Rock Tunnel of the Upper American River Project in the foothills of the Sierra Mountains exhibited failing rockbolts and ground falls. R
Jun 13, 2021
-
Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021By Roland Arnold, Richard Gradnik, Martin Zeindl
This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of
Jun 13, 2021
-
Crushing and grinding at Amax's Sleeper gold mineBy J. J. DeMull, B. A. Boster
Amax's Sleeper mine uses conventional cyanidation milling and heap leaching techniques to produce gold. Since milling operations commenced in March 1986, average ore processing rates have improve
Jan 1, 1990
-
Groundfall Risk Assessment Methodology To Minimize The Number Of Fatal Accidents In Artisanal And Small- Scale Mining (Asm): Miner's Perceptions In Human Behavioral Factors - SME Annual Meeting 2022By L. M. Sandoval, R. Kaunda, C. N. Vasquez, S. C. Falcon
Artisanal and small-scale mining (ASM) involves a wide range of practices, from highly informal and minimally mechanized mining operations with predominantly manual work to formal practices carried ou
Mar 2, 2022
-
Integrating a Drill Rig into the Digital Mine 4.0 Ecosystem - SME Annual Meeting 2025By Max Friedemann, Alexandros Bousdekis, Anna Gustafson, Helmut Mischo, Håkan Schunnesson
Many devices used in mining are not monitored by sensors or do not have their own intelligence. By retrofitting sensors and real-time data processing, machines can be integrated into an existing digit
Feb 1, 2025
-
Kickstarting Culture Change - SME Annual Meeting 2024By Andrew McGrath, Geraldine Lyons, Sarah Barcelona
In the dynamic and challenging modern industry landscape, understanding and unleashing the true role and contribution of technical teams is crucial to business success. The cyclical nature of industri
Feb 1, 2024
-
Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka
The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin
Jun 23, 2024
-
Evaluating Options in Design of the Akron Northside Interceptor Tunnel (NSIT) Tunnel Diversion and Flow Control Structure - NAT2024By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel (NSIT) project to control and reduce combined sewer overflows. One component of the project a large diameter tunnel diversion / flow c
Jun 23, 2024
-
Open-Pit Load & Haul Simulator: Exploring the Effects of Haul Truck Electrification on Mining ProductivityBy Josiah Pohl, Christopher Utter, Kyle Everly, Akshay Chowdu
Battery Electric Vehicles offer increased energy efficiency for open-pit load & haul operations at a potentially lower overall carbon cost. Electrifying a mine’s fleet, however, presents a unique set
Jun 25, 2023
-
New Diversion Hydropower Plant—Nedre Fiskumfoss - RETC2023By Mads Aniksdal
New Nedre Fiskumfoss is a construction project in North Trøndelag, Namsen River. The purpose of the contract is construction of a new hydropower plant, that will phase out the existing power plant in
Jun 13, 2023
-
Analysis of coal rib fracture depth using numerical modeling and artificial neural networkBy Yuting Xue, Khaled Mohamed
The failure of coal ribs is a major hazard in underground coal mines. Researchers from the National Institute for Occupational Safety and Health (NIOSH) have been working on the development of an engi
-
Optimization of surface mining dig limits with a practical heuristic algorithmBy Y. V. Vasylchuk
An algorithm is presented for optimizing the classification of surface mine material subject to excavating constraints. High-resolution, expected-profit models are optimized to classification maps sub
-
Evaluation Of Progressive Rib Failure In Thick Coal SeamsBy W. C. Smith
Even with the most conservative mine plan, rib instability can occur unexpectedly, and if not adequately dealt with, can progress from a nuisance to a major safety hazard. This Bureau of Mines paper e
Jan 1, 1989
-
Permitting A High Profile MineBy R. E. Nelson
The Alton Coal project, located in south-central Utah, lies at one point just over six miles from Bryce Canyon National Park. This region of the southwestern United States has been called the "Golden
Jan 1, 1988
-
Confidence Interval Estimation For Minable ReservesBy B. M. Davis
The uncertainty associated with a reserve estimate has generally been expressed as a subjective ranking rather than a quantitative expression of either reliability or uncertainty. These rankings of es
Jan 1, 1992