Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Holistic Approach to the Drill and Blast ProcessBy Tom BoBo, Seth Gering, Jeff Loeb
Presenting a D&B feedback loop built on a well-designed blast, proven fragmentation analysis and blast monitoring solutions, underpinned by technology that not only increases profit from every blast,
Feb 1, 2020
-
Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and PredictionsBy David Jones, Jeff Bregar, Damien Bell
We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in
Feb 1, 2020
-
The Improvement in Fragmentation of the Hardest Jaspilite LithologyBy Carlos Campos Junior, Leonardo Soares Chaves, Raul Carretero Hoz, Renato Jacome Costa, Davi Bastos Martins de Oliveira
The Vale’s Serra Sul mine, also known as S11D project, is one of the world’s largest open pit iron ore mines, located in Brazil’s Amazon region. The mine produces around 90 Mt of high-quality iron ore
Jan 21, 2025
-
Stope performance optimisation through the introduction of new underground bulk explosives technologyBy S. Evans, J. Phillips-White, D. Morton
The partnership between Orica and MMG at the Dugald River Zinc mine in Australia has led to the first global field trials and deployment of Orica’s Subtek™ 4D™ (hereafter referred to as 4D) Bulk Syste
Jan 1, 2024
-
Tehachapi, CA, Double-Track Project, Rock Slope Design and ExcavationBy Thomas Pallua, William C. Gates
"Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im
Jan 1, 2017
-
Tunnel Construction Efficiency and Vibration Control using Electronic Detonators: Focusing on the Contour Holes and Decking ModeBy Sami Kara, Yunseok Park, Seung-Joong Lee, Namsun Hwang, Michael Laing
This study conducts a comparative analysis of construction efficiency. In the first part we compared electronic and non-electric initiation systems, focusing on tunnel contour holes. Field blasting op
Jan 21, 2025
-
Advancing Blast Fragmentation Assessment Using Geotechnical Discontinuity Analysis Within a Unified WipFrag FrameworkBy Andrew Palangio, Blessing Taiwo
Understanding rock mass structural features is essential for optimizing blast design, highwall control, and evaluating post-blast performance in both surface and underground mining operations. This pa
Jan 26, 2026
-
Preventing Slope Failure: Establishing Safe Vibration Limits in Discontinuous Rock MassesBy Jorge Cardenas, David Martinez
Blasting-induced vibrations can be predicted with high precision, allowing for the optimization of sequence design, delay timing, and charge configurations to minimize their indirect impact on rock ma
Jan 26, 2026
-
Improving Geologic Knowledge with IOT Sensors on Blasthole DrillsBy Steven Putt
The paper presents new results from Datacloud during recent Seismic While Drilling trials in iron ore, metallurgical coal, and hard rock mines around the world. The measurements are compared with wire
Feb 1, 2020
-
Worsey-Silva Equation for Modeling Fragmentation Caused by Row TimingBy J. Silva, T. Worsey
The Worsey-Silva equation determines the optimal row timing for the smallest fragmentation and allows fragmentation models to be adjusted due to row timing. The equation utilizes the concept of dynami
Jan 1, 2024
-
Design/Build Highway Blasting - Case StudyBy Cathy Aimone-Martin, Frank Achuff
The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i
Jan 1, 2004
-
Blasting Specifications and Guidelines for Protective and High-Profile BlastingBy Brian Lewis, Reinhold Daykin Schnell
Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger
Feb 6, 2023
-
Controlling Overbreak Through Vibration MonitoringBy Kaushik Dey
Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre
Jan 1, 2008
-
Measuring Blast Induced Damage by Applying the MASW Geophysical MethodBy Charles Zdazinsky
Many blasting applications in the mining industry demand that the hard rock being blasted remains structurally competent. For example, pre-splitting is a common technique to reduce fracturing, and ope
Jan 1, 2011
-
Fragmentation of Sandstones and QuartzitesBy Lewis L. Oriard
Some two million cubic yards of sandstone and orthoquartzite were blasted and excavated at Upper Stillwater Dam, located high in the Uinta Mountains in northern Utah. The material was processed to pro
Jan 1, 1993
-
Investigation of ANFO’s Behavior under Various Conditions - Phase 1By E. Contestabile, B. von Rosen
On August 5th, 1998, a tractor-trailer carrying approximately 18,000 kg of blasting explosives, struck a rock face on the side of the road near the town of Walden, Ontario. Eye-witness accounts of the
Jan 1, 2001
-
Reduction of Vibration in a Low Frequency Zone at Construtora Sultepa EV QuarryBy D. C. Valdemeri, Oppermann J. P. Z., R. G. Schaarschmidt, C. S. Mendonca
This case study was conducted in an aggregate company, located at Estância Velha town, RS, Brazil. The study was based on the results of vibration monitoring mainly in terms of PPV (peak particle velo
Jan 1, 2015
-
Testing of a New Blasting Mat Constructed Using Rubber Tractor TreadsBy Matthew K. Coy, Paul N. Worsey
The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea
Jan 1, 2015
-
Vertical Attenuation of Blast VibrationsBy Catherine T. Aimone-Martin, Brent Meins
Blast vibration monitoring for buried pipelines is typically conducted at the ground surface with a shallowly buried geophone. In many jurisdictions across the U.S., blast-related vibration limits se
Jan 1, 2019
-
Blast Vibration Monitoring & Calibration in the 21st CenturyBy W. J. Birch, R. Farnfield
Nuisance caused by perceived high vibration levels as a result of blasting on quarries and opencast coal mine is now the number one environmental concern of residents living adjacent to such operation
Jan 1, 2014