    Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction

    By Garland Likins

    The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t

    Jan 1, 1998

  • DFI
    2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure Interaction

    By Yahia M. Al-Smadi

    Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t

    Jan 1, 2010

  • DFI
    Economic Foundation Design For Tall Buildings

    By Frances Badelow

    This paper describes a design process for piled raft foundations supporting high-rise buildings. The design process comprises an initial stage of geotechnical site characterization using the results o

    Jan 1, 2006

  • DFI
    UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology

    By Dario Libano, Armando Caputo, Francisco Caputo

    "UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent

    Jan 1, 2009

  • DFI
    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary

    By Bill Starke

    The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c

    Jan 1, 1997

  • DFI
    Trench Cutter - The Multi Purpose Solution

    By Alexander Blatt, Franz-Werner Gerressen

    Power Point Presetation at DFI 2022

    Sep 1, 2022

  • DFI
  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • DFI
    Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven Piles

    By James A. Schneider

    Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin

    Jan 1, 2009

  • DFI
    Foundations On Karstic Limestone In Kuala Lumpur Malysia ? Synopsis

    By J. M. Mitchell

    Kuala Lumpur, Malaysia is underlain by karstic limestone. Firm clays, mudstones and siltstoncs of the Kenny Hill Formation overlie the limestone for about two thirds of the city. The remaining third h

    Jan 1, 2010

  • DFI
    A Case Study Of Passive Piles Failure In Open Excavation

    By S. T. Kok

    This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from

    Jan 1, 2009

  • DFI
    Inference in the Detection of Pile Integrity Defects Using Current Quality Control Methods

    By T. Wulleman, M. Ansriou

    Integrity testing is a primary quality control check on a product that is for the most part not accessible to visual examination. Their cost can be expensive when using direct methods of inspection (l

    Jan 1, 2019

  • DFI
    Geospatial Project Information Management System At Herbert Hoover Dike

    By Jamey Rosen

    A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of

  • DFI
    Army Corps Mega Projects Benefits From Innovative Foundations

    By Dale Berner, Michael O’Sullivan

    "This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr

    Jan 1, 2017

  • DFI
    DFI Model Piledriving Contractor Proposal

    With respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o

  • DFI
    Structural Evaluation of Thermal Integrity Profile Results of Transmission Foundations

    By Ryan Weaver, Travis Coleman

    The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b

    Jan 1, 2019

  • DFI
    Evaluation of Soil-Bentonite Backfill Consolidation Properties

    By Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang

    Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.

    Jan 1, 2016

  • DFI
    Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses

    By Giovanni Lombardi

    In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep

    Feb 10, 2003

  • DFI
    Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff Wall

    By Gene Bryant, Wesley Schmutzler, Matteo Bertoni

    The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00

    Jan 1, 2019