Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Drilled Pier Foundations for Mercedes-Benz Stadium

    By Jean Wehbe, Daniel C. Brahana

    "The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece

    Jan 1, 2016

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • DFI
    Ductile Iron Pile Foundation Solution for Interior Retrofit Projects

    By Keithe J. Merl, Brendan FitzPatrick, Gregg Piazza

    Urban and industrial construction projects commonly involve interior work within buildings, warehouses and manufacturing facilities. Renovations of these existing structures must address both structur

    Jan 1, 2019

  • DFI
    Thornton Road, Listerhills, Bradford

    By B. C. Slocombe

    A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces

    Jan 1, 1989

  • DFI
    Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa Rica

    By Mauricio Coto

    Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated

  • DFI
    Excavation Support At Historic Buildings In An Urban Environment - A Case Study

    By Tony Mazzo

    It has often been said by consulting engineers that foundation contractors are in the business of taking risks. One would agree that the mere fact a foundation project can be budgeted, planned, engine

    Jan 1, 2003

  • DFI
    Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, Toronto

    By Graeme Smart, Thomas Fiala

    "Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron

    Jan 1, 2015

  • DFI
    Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation Support

    By Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree

    A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)

    Jan 1, 2018

  • DFI
    Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin

    By J. Racinais, P. Vincent

    "In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m

    Jan 1, 1900

  • DFI
    Metro Sports Facility – A Ground Improvement Case Study

    By I. D. McPherson, Dominic P. Mahoney

    The Metro Sports Facility is currently under development in Christchurch, New Zealand and is a key Anchor Project in the city’s post-earth quake recovery. When completed it will be largest indoor spor

    Nov 1, 2022

  • DFI
    Innovative Use Of Ground Improvement

    By Mark Koelling

    This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord

    Jan 1, 2010

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • DFI
    USTA Geoseismic and Foundation Design Challenges

    By Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef

    "The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s

    Jan 1, 2015

  • DFI
    Time-Dependent Increase In Load Capacity Of Tapered Piles

    By Jeongbok Seo

    This paper describes successful application of driven tapered-steel-pipe piles for two large-scale projects in the New York metropolitan area: Rego Park Mall, Rego Park, N.Y. and 164 Kent Avenue, Broo

    Jan 1, 2008

  • DFI
    Testing and Optimizing Rammed Stone Columns Design as a Soil Improvement Method on Soft Soils for MSE Walls Foundations

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan

    Rammed stone columns and similar reinforcement systems are used worldwide more frequently as a cost-effective method for improvement of foundations on soft soils. The effectiveness of the treatment me

    Sep 8, 2021

  • DFI
    High Capacity Hollow Core Bar Piles

    By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel

    "A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry

    Jan 1, 2017

  • DFI
    Rectification Measures And Restoration Of Distressed Pump Foundations

    By V K. Panwar, Sampat Raj

    At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t

    Nov 1, 2022

  • DFI
    Dynamic Characterization Of Drilled Shafts On Doremus Avenue Bridge

    By Martina Balic

    Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid

    Jan 1, 2004

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • DFI
    Vertical Load Carrying Capacity Of Concrete Expanded Base Piles

    By Mustapha Zergoun

    This paper presents the results of load tests to assess the vertical load carrying capacity of concrete expanded base piles, or pressure injected footings, for various projects located near Vancouver,

    Jan 1, 2004