    Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building Technologies

    By P. Arz

    With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al

    Jan 1, 1989

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015

  • DFI
    Design and Construction of Nysted Offshore Wind Farm, Denmark

    By Jørn Thomsen, Christoffer Brodbaek

    "As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th

    Jan 1, 2009

  • DFI
    Dynamic Load Testing of Drilled Deep Foundations

    By Paikowsky, Samuel G.

    "Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically

    Jan 1, 2015

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    Dynamic Pile Monitoring For Offshore Pile Acceptance

    By Scott Webster

    Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than

    Jan 1, 2010

  • DFI
    Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support Columns

    By Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury

    "The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb

    Jan 1, 2016

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Deep Cfa Piles Application For Foundation In Queensland

    By Sameh M. Khella

    This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t

    Nov 1, 2022

  • DFI
    Numerical Modeling of Foundation Deformation Due to Fault Rupture (718b3bb2-ba73-41ae-ad4b-2a32fb89742b)

    By Orestis Zarzouras, Amalia Giannakou, Jacob Chacko

    "When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediat

    Jan 1, 2017

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    You Can't Drive Piles Because Of The Vibration

    By Jerry A. Steding

    How many times have you heard "You can't drive piles because of the vibration."? You hear these words come out of the mouths of owners, engineers, and contractors. When a piling contractor he

    Jan 1, 1988

  • DFI
    Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?

    By Franz-Werner Gerressen, Manfred Schoepf

    "Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,

    Jan 1, 2015

  • DFI
    Post-Katrina Emergency Interim Flood Protection

    By Fred Fuchs

    "Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many

    Jan 1, 2008

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)

    By Omer F. Usluogullari, C. Vipulanandan

    "It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa

    Jan 1, 2017