Search Documents

  • NIOSH
    OFR-85-75 Develop And Test Canopy Air Curtain Devices - 1 Introduction And Summary

    By William J. Krisko

    This contract final report summarizes the design, fabrication and testing of canopy air curtain devices under Bureau of Mines Contract H0232067. The canopy air curtain device is designed to reduce the

    Jan 1, 1975

  • AUSIMM
    Long-Hole Directional Drilling Applications at Huntly West Mine, New Zealand

    By D Vickers, N C. Fowke

    The reduction of geological risk for planning of high production longwall faces is essential. Geological and geophysical techniques applied at Huntly West Mine before 1989 were unable to reduce the ge

    Jan 1, 1991

  • AIME
    Iron and Steel. Institute of Metals Meeting

    By AIME AIME

    T HE Institute of Metals Division and the Iron and Steel Division will meet jointly at the Stevens Hotel, Chicago, during the week of the American Metals Congress, Sept. 22-26. The Iron and Steel Di-

    Jan 1, 1930

  • DFI
    Statnamic Load Testing Of Strain Instrumented Large Diameter Bored Shafts - Synopsis

    By Matthew Janes

    Statnamic load testing is becoming widely accepted as a method to quickly and economically determine the load-deflection behaviour and ultimate static resistance of high capacity deep foundations. Str

    Jan 1, 1996

  • CIM
    Condition Monitoring and Basic Maintenance?. One Without the Other?

    ? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti

    Aug 1, 2013

  • AUSIMM
    Detachment of Particles from Bubbles in a Stirred Cell

    Detachment of Particles from Bubbles in a Stirred Cell

    Sep 13, 2010

  • AUSIMM
    The Optimisation of Semi-Autogenous and Ball Mill Based Circuits for Mineral Processing by Means of Versatile and Efficient High Pressure Grinding Roll Technology

    By M J. Daniel

    Mineral resources all over the world are often heterogeneous and have variable ore properties and ore grade. As a result the ore processed in concentrating plants varies over the life of mines. Conseq

    Jan 1, 2009

  • CIM
    Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling Operation

    By Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin

    "In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14

    Jan 1, 2011

  • CIM
    Water Control Technology Innovative Solutions for Underground Mines

    By Peter White

    Mine Planning Shaft Collar Shaft Sinking Raises Ramp Underground Water Storage

    May 1, 2009

  • SME
    GIS and Bauxite Mining in Jamaica

    By Jim Baumann

    Deposited millions of years ago in irregular paleokarstic channels, Jamaica’s extensive bauxite deposits provide good quality ore for alumina production and subsequent aluminum smelting. Bauxite minin

    Jan 1, 2002

  • AUSIMM
    A Modified Ten-Inch Slide-Rule for Surveyors

    THE slide-rule, as a quick and convenient instrument for performing approximate calculations, is steadily growing more and more into favour with the engineer, and results obtained by it are considered

    Jan 1, 1912

  • CIM
    Terraflow: A Cost-effective Alternative Binderin Backfill Application

    By Ike Isagon

    Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme

    Nov 1, 2011

  • NIOSH
    Computational Fluid Dynamics Study On The Ventilation Flow Paths In Longwall Gobs

    By Jürgen F. Brune, Liming Yuan, Alex C. Smith

    To provide insights and assistances for the optimization of ventilation systems for U. S. under-ground coal mines facing both methane control and spontaneous combustion issues, a computational fluid d

  • CIM
    Start-Up and Early Optimization of the New Afton Concentrator

    By C. O’Hara, S. Roy, K. Swedburg, J. Katchen

    "New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve

    Jan 1, 2015

  • SME
    Big Hole Drilling -- The State Of The Art

    By M. D. Lackey

    The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being

    Jan 1, 1983

  • ISEE
    Mini-Bench Blasting Applicability at the Excavation for Foundation in Settlement

    By Sadettin Bagdatli, Ali Kahriman, Umit Ozer, Alper Celtikci, Yucel Karakus

    Due to population growth and rapid urbanization in Turkey, the need for the construction of residential units, transportation and infrastructure facilities has become increasingly more pressing. Since

    Jan 1, 2014

  • ISEE
    Modified Case Charge for Avalanche Control

    By Eduardo Lozano, Vilem Petr

    This paper provides an overview of a new method for avalanche control using a high explosive charge placed at the avalanche runout zone: the case charge technique. This new avalanche control technique

    Jan 1, 2018

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • DFI
    Effective Analysis Of Soil-Pile Interaction Under Dynamic Loads

    By Inn-Joon Park

    Major problems associated predicting soil-structure interaction behavior are based on the fact that soil is neither homogeneous nor elastic and soil properties are spatially variable. There also exist

    Jan 1, 2002

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002