Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

Deep Foundations Institute
Antal Partos
Organization:
Deep Foundations Institute
Pages:
15
File Size:
844 KB
Publication Date:
Jan 1, 1992

Abstract

ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test borings were drilled and laboratory testing completed for shear strength and compressibility. Vertical drains were proposed to accelerate time rates of settlements. Steel erection was completed by May 22, 1981 with very small < 0.1 in., settlements. Hydrotesting was initiated on July 9, 1981 and completed on August 27, 1981. An average rebound of 0.3 in. was computed resulting into an average net settlement of 0.5 in. This paper describes in detail soil behavior during load testing.
Citation

APA: Antal Partos  (1992)  Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

MLA: Antal Partos Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La. Deep Foundations Institute, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account