Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Measurement Of Structural Deformation And Tilt During SubsidenceBy Revendra Awasthi
The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi
Jan 1, 1990
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case StudyBy Erik C. Westman
The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re
Jan 1, 1993
-
The Design of Room and Pillar Mining Systems in the UKBy Graham Daws
State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R
Jan 1, 1998
-
Intersection Stability and Tensioned BoltingBy Yunqing Zhang
Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt
Jan 1, 2003
-
Economic Evaluation Of Subsidence Damage Mitigation TechniquesBy David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
Mining-Induced Stress Measurement With Hydraulic Borerole Pressure CellsBy Paul A. Lu
This paper proposes an unconventional, simple, and practical method of measuring mining-induced around stresses with hydraulic borehole pressure cells. The method is a direct ground stress measuring t
Jan 1, 1984
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
Prevention. Control and Management of Coal and Gas OutburstsBy Lu Jiam Zhang
Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di
Jan 1, 1987
-
Research And Application Of Combined Reinforcement SystemBy Binchuan Zhang
The combined reinforcement system (CRS) combines the strengths of roof' bolting, resin-anchored cable bolt, and chemical grouting to effectively control the deformation of the strata surrounding
Jan 1, 2001
-
Greater Safety With Increased Productivity Coal Mining OperationsBy William B. Beerbower
When full length resin grouted bolts were introduced into U. S. coal mines some 11 years ago, it was assumed that safety would be the primary benefit. There is ample testimony to substantiate the safe
Jan 1, 1982
-
Application of the Coal Mining Roof Rating System in South African CollieriesThis paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001
-
Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface StructuresBy Yi You
A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term
Jan 1, 1997
-
Floor Heave in Shallow Room-and-Pillar MiningBy André Zingano
This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40
Jan 1, 2002
-
The Use Of Geologic Modeling In The Prediction Of Adverse Roof ConditionsBy Edward S. Custer
Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional
Jan 1, 1981
-
Shear Bond Stresses Along Cable BoltsBy Hani S. Mitri
The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio
Jan 1, 1990
-
Integrity Factor Approach to Assess the Stability of Room-and-Pillar MinesBy Kanaan Hanna
The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied
Jan 1, 1988
-
Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)By Bruce Hebblewhite
An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff
Jan 1, 2003
-
Eclipse System Improves Resin Anchored Rebar BoltingBy Al Campoli
The majority of the 100 million roof bolts installed each year in the United States are 5/8 inch deformed rebar fully grouted into a one inch borehole. Commonly referred to as B-Series or No. 5 bar, t
Jan 1, 2002
-
Delineation Of Abandoned Workings With An In-Seam Seismic MethodBy I. Geldmacher
In-Seam Seismic (ISS) methods have been used extensively worldwide for the past 10 years to assist mine planning, espe¬cially longwall mining in coal seams. The technique is only starting to gain wide
Jan 1, 1990