Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Investigation of the geomechanical criteria for safe and efficient crown pillar extraction beneath stabilised rock rockfill at the Crusader MineBy J. Whitford
The established crown pillar extraction method at Gold Fields Australia Ltd.’s Crusader Mine, leads to the significant dilution and poor recovery of ore due to caving of the overlying loose rockfill.
Jan 1, 2003
-
From Laboratory To Plant Implementation, A Study In Gravity ConcentrationBy Mark Van Kleek
CONTENTS ?The Falcon C ?Data from a Production Trial ?Methodology ?Scale-up ?Test Results ?Circuit Configurations ?Conclusion
Jan 1, 2006
-
Phase Equilibria In High MgO Ferro- And Silico-Manganese Smelting SlagsPhase equilibria have been determined experimentally for pseudo-ternary sections of the form ?MnO?-(CaO+MgO)-(SiO2+Al2O3) with a fixed Al2O3/SiO2 weight ratio of 0.17 and MgO/CaO weight ratios of 0.25
Jan 1, 2004
-
Further Processing And Granulation Of Slags With Entrained Metal And High Metal Compound Content, With Specific Reference To Present Manganese Slag Dumps As Well As Additions Due To Daily ProductionBy D. Norval
Keywords: Pyrometallurgy, slag, metal, entrained, granulation, ferromanganese Water granulation of certain slags with high metal entrainment has customarily not been practised, not only due to the
Jan 1, 2011
-
Hexavalent Chromium Air Dispersion Modelling In The South African Ferrochromium IndustryBy L. W. Burger
The need to establish and harmonise methodologies to quantify air emissions, atmospheric dispersion and the consequences of air pollutants (especially hexavalent chromium) from the ferrochrome industr
Jan 1, 2004
-
Kriging estimation of block densities in Ahmavaara PGE-depositBy E. Laine
Rock density determinations are necessary for ore resource evaluations from estimated block grades in g/t. Rock density depends on the mineral composition and, thus, it is specific for each rock type.
Jan 1, 2003
-
Merensky pillar strength formulae based on back-analysis of pillar failures at Impala Platinum - SynopsisBy B. P. Watson
The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies and strike for many hundreds of kilometres. Mining is extensive, with depths ranging from clos
Jan 1, 2008
-
An analysis of the practical and economic implications of systematic underground drilling in deep South African gold minesBy D. G. Krige
Using chip sample data and spatial structure parameters from a large mined-out section of a South African gold mine the advantages to be gained from a regular underground borehole drilling programme h
Jan 1, 2003
-
4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa MineBy Reginald N. Boryor, Steven D. Woods
1.0 Introduction ?Low grade, high tonnage, open pit gold mine. ?Gold bearing Tarkwaian conglomerates. ?Reverse Circulation percussion drilling (25m X 25m grid). ?Composite 1m intervals, logged a
Jan 1, 2005
-
Kyoto Carbon CreditsBy H. Immink
Keywords: Kyoto Protocol, carbon credits, global warming, energy, auditing Climate change is nowadays being taken increasingly seriously, and the link between global warming and the carbon dioxide
Jan 1, 2006
-
Gas-Phase Fluorination Kinetics Of Ta2O5 With Elemental Fluorine - SynopsisBy A. D. Pienaar
The aqueous chemistry of niobium and tantalum compounds with hydrofluoric acid is a mature field of investigation. In contrast, very little attention has been paid to reactions of these compounds in n
Jan 1, 2012
-
The influence of Fe3+/Fe2+ratio on the viscosity of silicate slagsViscosity measurement was carried out over a narrow range of silica content around the fayalite composition. A wide range of temperature and oxygen potential was covered where the slag was completely
Jan 1, 2004
-
Refining Testwork On Crude Magnesium Produced In The Mintek Thermal Magnesium ProcessBy M. Abdellatif
Keywords: Magnesium, pyrometallurgy, Mintek Samples of crude magnesium produced by the Mintek Thermal Magnesium Process were refined in two stages. The first stage consisted of co-melting of batc
Jan 1, 2006
-
Modeling Viscosities Of Ferromanganese SlagsBy Merete Tangstad, Kai Tang
The primary aim of the present investigation is to develop a model which permits to calculate/predict the viscosities of ferromanganese slags, typically focus on the MnO-SiO2-Al2O3-CaO-MgO-FeO multico
Jan 1, 2007
-
Pyrite roasting, an alternative to sulphur burning - SynopsisThe roasting of sulphide ores and concentrates is often the first step in the production of metals or chemicals. In many processes, the production of sulphuric acid is viewed as a by-product, whereas
Jan 1, 2009
-
Arc-Electrode Interactions In Silicon And Ferrosilicon FurnacesBy J. Bakken, M. Th. Jonsson, G. Sævarsdottir
A typical three-phase submerged-arc furnace for production of silicon metal and ferrosilicon has arc currents ~100 kA, phase voltages ~100 V and total furnace power ~10 - 60 MW. The arcs burn in gas f
Jan 1, 2004
-
Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? SynopsisBy D. Strachan
Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i
Jan 1, 2009
-
Strength of model rock masses with discontinuous jointsBy Van Sint JanM., M. Prudencio
ABSTRACT We report the results of a model-testing program to evaluate the strength characteristics of non-persistent joints. We describe the conditions under which new tensile cracks generate and
Jan 1, 2003
-
Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold MineBy D. F. Malan, Y. Jooste
"SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac
Jan 1, 2015
-
Implementation Of An Alternative Matte-Level Measurement Solution At Lonmin Marikana Smelter Division For Improved Process MonitoringBy T. J. Goff
Keywords: accurate control, matte level, smelting operations, process control, tapping, sounding bar, electromagnetic measurement [ ] Accurate control of matte levels during primary matte smelting
Jan 1, 2011