4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa Mine

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 31
- File Size:
- 1563 KB
- Publication Date:
- Jan 1, 2005
Abstract
1.0 Introduction ?Low grade, high tonnage, open pit gold mine. ?Gold bearing Tarkwaian conglomerates. ?Reverse Circulation percussion drilling (25m X 25m grid). ?Composite 1m intervals, logged and split in the field to provide±2Kg samples. ?Samples used to build grade control block models using SURPAC. ?Approximately 100,000-130,000 meters drilled per year. ?RC samples are assayed using Rapid Cyanide Leach (RCL). ?Check assays are done using Fire Assay
Citation
APA:
(2005) 4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa MineMLA: 4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa Mine. The Southern African Institute of Mining and Metallurgy, 2005.