Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Effects of Short Delay Times on Rock Fragmentation

    By Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson

    "Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements

    Jan 1, 2016

  • ISEE
    Applications of Metrics to Blast Designs

    By Thomas Hans Kleine

    In general the software required by a blast designer includes tools that graphically present blast designs (surface & underground), can analyze a design or predict its result, and can assess blasting

    Jan 1, 1995

  • ISEE
    Updates in the Determination of Dynamic Pressure Tests

    By Alejandro Ferrada Vergara

    Most blasting techniques that are designed to improve fragmentation and subsequently improve ore work index to downstream comminution processes, apply powder or energy factor increases, either by stre

    Jan 1, 2016

  • ISEE
    Evaluating Delay Effects on Ground Vibrations with Simulated Vibration Waveforms

    By Randall M. Wheeler

    It is important to be able to quantify the effects of blast delay designs on vibration characteristics. White was the first company to develop commercially available software, called Alpha-Blast, for

    Jan 1, 1994

  • ISEE
    Liquid Propellant Technology

    By Stanley Griff, William Herrera, William O. Seals

    "The Navy initiated liquid propellant research in the early 1940's. The first promising Navy liquid propellant, Otto Fuel II, was developd in the early 1950 as a potential torpedo fuel. Later, the Nav

    Jan 1, 1990

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • ISEE
    Delay Blasting Cap Corrosion of the Nonel by Acid Water

    By Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena

    "In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot

    Jan 1, 2016

  • ISEE
    Demonstrating Competence from Charge Hands to Chartered Engineers

    By Ken Cross

    This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a

    Jan 1, 2013

  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    Drilling and Blasting are core operations in a mine. They impact all the downstream operations and their costs. Digital technologies exist for optimizing both drilling and blasting for many years. How

  • ISEE
    Maximizing Drill Factors in Construction Blasting

    By Pat McLaughlin

    Blast design in the construction industry has often been based on past practice or powder factors. This is to some extent understandable, since construction projects do not have the longevity of minin

    Jan 1, 1994

  • ISEE
    Determining and Mitigating the Effects of Firing a Linear Shaped Charge Underwater

    By Brian T. Burch, Paul N. Worsey

    When fired, submerged Linear Shaped Charges (LSCs) lose all effectiveness in the cutting of steel. Users in underwater applications have reported having to substantially increase the charge size to th

    Jan 1, 2015

  • ISEE
    Rock-to-Sensor Transmissibility of Vibrations?Part 2

    By R Castedo, L. M. Lopez, J. A. Sanchidrian

    In 2014 the authors presented results from 13 tests made with two blasting seismographs on a vibration exciter. They measured coupling transmissibility as function of frequency (i.e. ratio of the vel

    Jan 1, 2015

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders

    By Jackson R. Pressley, Bruce Vandenberg

    An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.

    Jan 1, 1997

  • ISEE
    AN Railcar Derailed Debris Collection–Data Analysis Update

    By Brandon Fryman, Josh Hoffman, Rhys Baker

    A post-detonation debris collection project was led in conjunction with a large ammonium nitrate(AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Adminis

  • ISEE
    Wireless Electronic Blasting

    By Daniel Mallette, Richard Goodridge, C M. Lownds

    Despite a world of mobile devices that has many of us taking the ability to communicate wirelessly for granted, an in-hole wireless initiation system was thought to be not viable. The known and common

    Jan 1, 2016

  • ISEE
    Blasting Effects and Recommendations when Blasting Near Pressurized Buried Pipelines

    By John E. Wiegand

    This study will discuss the AMAX Coal Co., Penndiana Pipeline Project, which was conducted in conjunction with the following parties: AMAX Coal Industries, (U.S.B.O.M.) United States Bureau of Mines,

    Jan 1, 1994

  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th

    Jan 1, 1997

  • ISEE
    Application of Non-Newtonian Fluid Mixture for Stemming Performance Optimization

    By Braden Lusk, Paul Sainato, Josh Calnan, Hiago Vasconcelos, Luis Felipe Marinho

    "Blasting and rock fragmentation is one the most important unit operations in mining. Since itsintroduction into the mine production cycle, mining has become more efficient in mineral production(Hartm

    Jan 1, 2016

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016