Deep Drilling at Mica Dam, British ColumbiaBy Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer
"Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow
Jan 1, 2017
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.By Jim Bruce
This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss
Jan 1, 2004
-
Deepest Ever Large Diameter Pipe Pile Installation Demonstration Project New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
For the three full-scale pile installations, two different high-energy hydraulic hammers were selected for the installation. However, these hammers may not have sufficient energy to drive these large
Jan 1, 2002
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Experiences And New Developments In Offshore FoundationBy Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Corrosion Protection Of MicropilesBy Racquel Nottingham, Marc Mastrantuono
Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide
Oct 1, 2022
-
2022 OPA Winner: Mosul Dam Rehabilitation ProjectBy Raffaella Granta
Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo
Oct 1, 2022
-
Session 22 "Compaction Grouting and Limited Mobility Grouting"By Allen Cadden
The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n
Feb 10, 2003
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? SynopsisBy K. J. Yang
Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry
Jan 1, 2010
-
Risk Management Techniques to Avoid LitigationBy Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
Construction-Induced Vibrations And Green Concrete: Literature Review And Case HistoryBy William M. Camp
Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s
Jan 1, 2010
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
Novel Methods Of Restraining Embedded Retaining WallsBy Abid Adekunte
Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br
Jan 1, 2010