Helical Piles With Grouted Shafts - A Case HistoryBy Shawn Downey
A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to
Jan 1, 2003
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Innovative Micropile Retrofit Of Two Existing StructuresBy Terence P. Holman
Micropiles are employed to retrofit existing foundations, including underpinning prior to future construction operations and resupport of existing structures that have experienced distortion and settl
Jan 1, 2007
-
Compaction-Induced Lateral Earth Pressures And Vertical Shear Forces Acting On Non-Moving Retaining WallsBy George M. Filz
Restrained basement walls and unrestrained but massive concrete walls on rock foundations experience very small movements in response to lateral earth pressures. Such walls are often designed using at
Jan 1, 2003
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to InundationBy Adel M. Hanna, Ibrahim M. Mashhour
"Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou
Jan 1, 2015
-
Observational and Numerical Evaluation of Defects in Deep Mixing Method Columns Used for LNG Process Train Structural Foundation Support (30cbb62b-9335-4a4e-8105-e672f3e82ba5)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Edward C. Clukey
"Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility
Jan 1, 2017
-
Model Specification Helical Anchor Foundations Tension Applications"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider
Jan 1, 2016
-
A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge TestBy Chengcan Wang, Jin-Tae Han, Young-Eun Jang
"The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key
Jan 1, 2016
-
On The Ultimate Capacity And Radial Stress Distribution Of Driven Piles In SandsBy E. Ulrich Klotz
It is difficult to predict accurately the capacity of driven piles in sand. In practice, this uncertainty either leads to conservative designs if the capacity is under-predicted, or worse, if the cap
Jan 1, 2002
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And ConstructionBy Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Use of Post-Grouted Drilled Shafts in Coastal MississippiBy Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015
-
Buckling Resistance of Steel Micropiles with Mechanical SplicesBy Fredrik Sarvell, Harald. Ihler, Veli-Matti Uotinen, Jukka Rantala
"Many of the valid international building codes state that the lateral support provided by the soil is sufficient to prevent buckling of fully embedded piles. However, the development of small diamete
Jan 1, 2014
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Drilled Displacement Rigid Inclusions Support Port-Based Cement FacilityBy Morgan NeSmith
The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the
Apr 1, 2023
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d ModelingBy Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT SubwayBy Dharmil Patel, Michael J. Chow
"Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;
Jan 1, 2016
-
On The Axial Load-Bearing Behavior Of Vibrated And Impact Driven Full Displacement PilesBy Bastian Hoffmann, Christian Moormann
The paper presents results of an experimental study on the axial load bearing behavior of vibratory driven full displacement piles in comparison with impact driven and cyclic quasi-static installed pi
May 1, 2022