Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Dewatering Brunswick concentrates by pressure filtration

    By J. E. Nesset

    "As an alternative to conventional dewatering by vacuum filtration and oil-fired rotary dryers, Brunswick Mining conducted extensive pilot-scale testwork on its copper, lead, zinc and bulk concentrate

    Jan 1, 1982

  • CIM
    Gas Diffusion Rules Through Coal Particles of Different Sizes

    By Baisheng Nie

    The process of gas diffusion through coal particles and the mathematical physical model under the third kind boundary condition was determined to obtain the rules of gas diffusion through coal particl

    Aug 1, 2013

  • CIM
    The Ungraded-Fibre Mill

    By C. Gordon Saunders

    "The ungraded-fibre mill is located at the mine site and has a rated capacity of 6,600 tons of ore input and 1,200 tons of ung1•aded fib1 •e product per day. Power for operation is obtained from a die

    Jan 1, 1976

  • CIM
    Collaring a Shaft in Deep Overburden at Chimo Gold Mines Limited

    By J. S. Redpath

    Eighty feet of overburden, thirty feet consisting of fine, water-bearing sands, was encountered during the construction of a shaft collar for Chimo Gold Mines Limited at its Louvicourt, Quebec, proper

    Jan 1, 1966

  • CIM
    CFD Modeling of Methane Flame Interaction with a Simulated Longwall Coal Mine Gob

    By G. E. Bogin, C. Strebinger, J. F. Brune

    "Evidence shows that methane gas emanates from the mined-out area or gob of a longwall coal mine and can travel towards the working face, posing an explosion risk. Since the gob consists of varying le

    Jan 1, 2019

  • CIM
    Paste Backfill Responses in Deep Mine Temperature Conditions

    By M. Fall

    The progressive depletion of ore available at shallow depths in several underground mines around the world means that underground mining operations would increasingly be carried out at greater depths

    May 1, 2007

  • CIM
    Cold Water Thawing of Frozen Placer Gravel

    By John Lund

    INTRODUCTION GOLD-BEARING placers of Alaska and the Yukon Territories are buried under a layer of permanently frozen alluvial overburden, or 'muck', which varies in depth from twenty to one

    Jan 1, 1951

  • CIM
    Gaspe Copper Mines

    By A. M. Bell

    "The property of Gaspe Copper Mines, Limited, is in the Gaspe Peninsula some 60 miles west of the town of Gaspe and 20 miles in from the north coast. The Copper Mountain deposit was first discovered i

    Jan 1, 1949

  • CIM
    The work of the Mining Research Laboratories of CANMET

    By John E. Udd

    "Mining research at CANMET is delivered by the Mining Research Laboratories Division (MRL), with facilities in Sydney, Nova Scotia; Bells Comers, Elliot Lake, and Sudbury, Ontario; and Val d'Or,

    Jan 1, 1994

  • CIM
    Boiler Waters in Cape Breton Colliery District-A Progress Report

    By J. L. Bowlby

    TWO years ago, at the annual meeting of this Society, the writer presented a paper dealing with various aspects of the water problems existing in the Cape Breton coal-mining area. Much of that paper w

    Jan 1, 1936

  • CIM
    Automatic haulage truck-design, development and mine implementation at Inco Limited

    By G. R. Baiden

    "An Automatic Haulage Truck (AHT) has been developed for manless tramming of run-of-mine material in an operating mine. The AHT has a 70-ton capacity and uses an electric trolley system in combination

    Jan 1, 1992

  • CIM
    Variable speed AC drives -applications in mining

    By Kurt D. Mitchell

    "This paper discusses general application for A C variable frequency drives in the mining industry. A review of induction motors characteristics, adjustable frequency controller fundamentals, and thre

    Jan 1, 1986

  • CIM
    Recovery of Values from a Porphyry Copper Tailings Stream

    By Gerald H. Luttrell, Lance Christodoulou, Jaisen N. Kohmuench, Michael J. Mankosa

    The efficiency of the froth flotation process has long been known to be strongly dependent on particle size. For sulfide minerals, good recoveries are typically achieved in industrial flotation circui

    Jan 1, 2016

  • CIM
    AOSTRA underground test facility: progress and potential

    By R. W. Luhning, S. D. Gittins, J .. A. Haston

    "The Underground Test Facility (UTF) project operated by the Alberta Oil Sands Technology and Research Authority (AOSTRA) north of Fort McMurray has achieved marked success in field testing mining acc

    Jan 1, 1990

  • CIM
    Supervisors - their selection and development

    By Peter Moon, Lloyd G. Campbell

    "How well supervisors supervise, and are supervised determines whether management's goals will be reached and ...how effective the work force will be... Upper management must recognize the potent

    Jan 1, 1990

  • CIM
    Gasification: the route to clean and efficient power generation with coal

    By P. C. Richards

    "Future Integrated Gasification Combined Cycle (IGCC) power plants will have superior environmental performance and unmatched efficiency.The Shell Coal Gasification Process (SCGP) is a clean coal tech

    Jan 1, 1994

  • CIM
    A preliminary assessment of coal slurry pH and coal flotation as parameters of weathering in Western Canadian coals

    By D. L. Marchioni

    "The detection and quantification of the degree of weathering is an important aspect of coal exploration and mining. Tests for weathering which are suitable for the exploration camp should be fast, si

    Jan 1, 1981

  • CIM
    The application of modular plants to diamond recovery

    By Graham Popplewell

    "Modular, predesigned diamond recovery plants have been a feature of the diamond mining industry for more than 20 years. The reasons for the selection of such a design route are contrasted with the al

    Jan 1, 1992

  • CIM
    Diesel Diamond Drilling Underground

    By D. J. MacDonald

    UNDERGROUND development at the Lynn Lake property of Sherritt Gordon Mines, Limited, was begun in 1948 with the sinking of the A shaft in the area of the A orebody. By June, 1949, the shaft was compl

    Jan 1, 1951

  • CIM
    Conversion of a crushing plant to a gold mill in a copper smelter

    By G. Macfarlane

    "In 1985, a crushing plant, located in the feed preparation area of Kidd Creek's copper smelter, was modified. The plant, which originally had treated only copper-bearing materials for the smelle

    Jan 1, 1988