Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gold in Papua New Guinea

    Amongst the Pacific Rim countries, Papua New Guinea (PNG) is the leader in new gold discoveries and developments leading to new production. PNG has shown a dramatic increase in gold production wh

    Jan 1, 1987

  • AUSIMM
    The Many Uses of Rare-Earth Magnetic Separators for Heavy Mineral Sands Processing

    In the time since the first trials in the mid-1980s, the Rare-Earth Magnetic Separators (REMS) are presently (year 2001) found in many heavy mineral sands plants around the world. Both the roll and th

    Jan 1, 2001

  • AUSIMM
    A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysis

    By S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen

    Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result

    Jul 1, 2021

  • AUSIMM
    Iron Ore Pricing for Mine Managers

    Australia is the dominant iron ore supplier to the Asian market, a position that began to emerge with the development of the Pilbara in the 1960s. Iron ore is now one of AustraliaÆs main commodity exp

    Jan 1, 2006

  • AUSIMM
    The Requirements for Manufacture of Nuclear Fuel in Australia (fd7f48f2-d0b2-4fe8-9e93-17623f195119)

    Nuclear power stations to be installed in Australia will be fuelled from Australian resources of raw materials.This will require the establishment of new manufacturing industries and the eventual expa

    Jan 1, 1971

  • AUSIMM
    Environmental Assessment for the Golden Cross Mine Development, Waihi, New Zealand

    By R C. Owen, M A. Ward

    The paper describes the application of New Zealand's environmental impact assessment procedures to a proposed gold and silver mine in the North Island of New Zealand. The project is described and

    Jan 1, 1988

  • AUSIMM
    Capacity Evaluation of Iron Ore Processing Facilities Utilising Dynamic Simulations

    By N Steenkamp, L Furstenberg, W Cele, M Richter

    Managing productivity and improving efficiency for a healthy return on capital employed have become key mining industry strategies under prevailing tough global market conditions. However, achieving t

    Jul 13, 2015

  • AUSIMM
    Water Savings and Coal Product Compromise

    Water Savings and Coal Product Compromise

    Sep 13, 2010

  • AUSIMM
    Development of a nitrogen prediction model for 320 tonne converter

    By Y D. Jeon, K S. Kim, C-H Eom, C M. Yoon

    The carbon neutrality continues to require reduction of carbon usage in ironmaking and steelmaking processes. Specially, it is expected that the hot metal ratio (HMR) in the steelmaking process should

    Aug 21, 2024

  • AUSIMM
    Application of DDM to Some Rock Pressure Problems in Japanese Deep Coal Mines

    By Ishijima Y, Goto T

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM appl

    Jan 1, 1992

  • AUSIMM
    Exploration in the Gippsland, Bass and Otway Basins

    Location & Permit Status Three major Mesozoic Tertiary basins exist along the continental shelf area of southeastern Australia, known as the Bass Strait area. They are the Gippsland (east of the long

    Jan 1, 1970

  • AUSIMM
    Use of Metallurgical Test Data in Resource Evaluation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Jul 11, 2011

  • AUSIMM
    Finding a social license on the deep seabed – risks and mitigation strategies for exploitation activities in the absence of exploitation regulations under UNCLOS

    By A Murphy, I Samsonova, N Eastwood, D Whittle

    Part XI of the United Nations Convention on the Law of the Sea (UNCLOS or the Convention) (United Nations (UN) Division for Ocean Affairs and the Law of the Sea, 1982) establishes a comprehensive regu

    Sep 1, 2024

  • AUSIMM
    Still the Lucky Country?-Minerals and Human Resources

    In Australia we usually define "resource" in purely material terms, and rarely relate it to intellect and human capacity. We look at the sheer abundance of our natural resources and are satisfied w

    Jan 1, 1986

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practice

    By M Laxman, A Kundu

    After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op

    Jul 23, 2018

  • AUSIMM
    Complex Criterion for Real-Time Truck Dispatching

    By Shuguang L, Jing S

    Computer controlled truck dispatching systems is a newly-developed technical system in surface mines with shovel-truck technology. The real time dispatching criteria, as the core of optimal truck di

    Jan 1, 1995

  • AUSIMM
    Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

    By I Chan

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War

    Jan 1, 2008

  • AUSIMM
    Stope Optimisation Tools for Selection of Optimum Cut-Off Grade in Underground Mine Design

    By B Hall

    In feasibility studies the choice of optimum cut-off grade is typically based on an evaluation of tonnage grade curves and manual design of stopes at one or two cut-off grades. In the industry these s

    Jan 1, 2009