Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Museum Station -Construction

    By Withington J. T

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)

    By Shillabeer J

    Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno

    Jan 1, 1998

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    Using Geostatistics to Assist in Optimising Grade Control Estimation at KCGM's Fimiston Open Pit

    By Kelly D, Moore C

    The Golden Mile, which has been mined continuously for the past 100 years by both underground and more recently open pit methods, occupies an area of 1.2 km by 4 km adjacent to the city of Kalgoorli

    Jan 1, 1994

  • AUSIMM
    MSR Implementation and Progress

    By Ellicott C, Webb N

    In November 1996 the NSW Minister for Mineral Resources, Hon Bob Martin MP, commissioned ACiL Economics and Policy Pty Ltd to conduct a wide ranging review of safety within the New South Wales mining

    Jan 1, 1998

  • AUSIMM
    Elaine Dorothy Cu-Au (REE-U) Skarn Deposit

    By P Sha

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia

    Mar 18, 2015

  • AUSIMM
    A Review of Coal Mining Safety Research in Queensland

    The incidence of colliery disasters has highlighted the need for more centralised and directed coal mining safety research in Queensland, with particular impetus from explosions at Box Flat in 1972, K

    Jan 1, 1991

  • AUSIMM
    Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron Project

    By G J. Showers, P Botman, A G. Hunt

    Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo

    Jul 13, 2015

  • AUSIMM
    A novel approach to evaluating gravity pre-concentration amenability utilising the hydrodynamics of dense liquids in inclined channels

    By J Zhou, T D. McGrath, K P. Galvin, C P. Lowes, J J. Eksteen

    Pre-concentration of low grade ores can improve the economic and environmental sustainability of an operation significantly, with opportunities for implementation ranging from run-of-mine to mill disc

    Nov 10, 2020

  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    Longhole Open Stoping Practice in 'B' Lode at New Broken Hill Consolidated Limited

    Longhole open stoping was introduced in the zinc-rich 'B' lode at New Broken Hill Consolidated Limited (NBHC) during 1968. Since then one longitud- inal and a series of transverse longhole

    Jan 1, 1971

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013

  • AUSIMM
    Bleg: A Geochemical Tool in the Great Sandy Desert

    The BLEG (Bulk Leach Extractable Gold) technique is a semiquantitative measure of cyanide extractable gold contained in a sample. A 5kg sample is leached in cyanide solution for 24 hours and gold

    Jan 1, 1988

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    Comparative Proton and Electron Probe Study of Two Representative Indium-Bearing Deposits (PACRIM'95)

    By S H. Sie, R Seetharam, K Naito, T Takagi

    Tin-polymetallic vein type deposits are one of the major source of metal producers in the Circum Pacific Belt. This type of deposit is of great importance for the modem electronics and medical industr

    Jan 1, 1995

  • AUSIMM
    Mineralogical Quantification of Iron Ore Sinter

    By S Hapugoda, J Manuel, E Donskoi, L Lu

    Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det

    Jul 13, 2015

  • AUSIMM
    Freeport's Fourth Concentrator-A Large Step Towards the 21st Century

    By Napitupulu P

    PT Freeport Indonesia currently operates a concentrating complex capable of milling 127 000 metric tonnes per day of copper and gold hearing ore. The facilities consist of both a conventional crushi

    Jan 1, 1997

  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974