Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Crown and Rib Pillar Recovery Techniques in Underground Hard Rock Mining

    By Szymanski J, Planeta S

    For many hard rock mines with near surface deposits, the surface crown pillars form the first line of protection for the immediate underground workings. Underground stopes are typically contained by

    Jan 1, 1995

  • AUSIMM
    Mechanics of Rock Drilling, Cutting and Future Developments

    By Aziz NI, Guo H

    Most of the existing models of the mechanisms of drilling and cutting processes are oversimplified in both stress state and failure criterion. On the other hand numerical modelling techniques are a

    Jan 1, 1988

  • AUSIMM
    Occupational Diseases in China, with the Emphasis on Its Occurrence in Chinese Mine Workers

    By Y Cao, J C. Tien

    Occupational health and safety is essential in modern mining workplaces and in China it is often not given enough emphasis due to a lack of knowledge and/or appreciation. Although many health and safe

    Aug 31, 2015

  • AUSIMM
    Virtual Hailage Trucks: Improving the Safety of Surface Mines

    By Denby B, Hollands R. Schofield D

    Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th

    Jan 1, 1998

  • AUSIMM
    Coolgardie Gold NL - William Ford Decline: Narrow Vein Sub-Level Up-Hole Mechanised Stoping and Long Hole Rise Blasting Practices

    By Will D

    This presentation is to outline the current practice of mechanised stoping a one-metre wide, gold bearing ore body to optimise fragmentation, minimise dilution and reduce stoping costs.Coolgardie unde

    Jan 1, 1993

  • AUSIMM
    Ventilation of Single Entry Developments at Ellalong Colliery

    By Wallman D

    Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam

    Jan 1, 1983

  • AUSIMM
    A Simulation of the Kalgoorlie Nickel Smelter Flowsheet Using METSIM

    By Gray N. B, Grimsey E. J

    A steady state heat and mass balance simulation of the Western Mining Kalgoorlie Nickel Smelter (KNS) flowsheet was developed within the framework of the commercial software METSIM. The KNS simulati

    Jan 1, 1991

  • AUSIMM
    Waste Processing in the Zinc Industry Using Ausmelt Technology

    By Robbilliard K. R, Floyd J. M

    The problems facing the metallurgical industry from the viewpoint of the range of unacceptable residues, flue dusts and slags currently produced from the electrolytic zinc process, electric arc furn

    Jan 1, 1993

  • AUSIMM
    Suspension Roasting of Pyrite and Copper Concentrate

    By Soma T

    Pyrite and Cu-concentrate were roasted in vertically suspended state in an externally heated tube. Tubes of three different lengths of reaction zone were used for three different reaction times. R

    Jan 1, 1980

  • AUSIMM
    Development of Equipment Types at Renison Mine

    By Clarke RG

    Renison Mine was developed as the first all diesel mine in Australia. The foresight of the early planners in committing the Mine to Decline access has paid dividends in the past two decades with R

    Jan 1, 1982

  • AUSIMM
    Bankshooting Techniques at Moura Open Cut Coal Mine, Queensland

    By Hoppe AJ

    Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro

    Jan 1, 1978

  • AUSIMM
    Heap Leaching at Camel Creek Mine

    By Menne D. M, Ladyman R

    Camel Creek Mine operated by Lynch Mining Pty Ltd is located 65 km west of inghain and 160 kin north west of Townsville in North Queensland. (Figure 1). The Camel Creek gold mineralisation was disco

    Jan 1, 1994

  • AUSIMM
    Support of Longwall Workings in Thick Seam Extraction

    By Smith PE

    The main components of face design are the power loader, face conveyor and powered support system and the interaction of these components determines the effectiveness of strata control. A major in

    Jan 1, 1986

  • AUSIMM
    Close Range Photogrammetric Mapping of Open Pit Mine Wall Failures

    By Campbell R

    The use of a 35mm non-metric SLR camera and an analytical plotter to prepare close range photogrammetric (CRP) plans of a quarry and open pit mine face is described. The plans, at scales ranging from

    Jan 1, 1990

  • AUSIMM
    The Assessment of Cast Blasting Practices Using Monitoring Techniques

    By Moxon N. T, Berndt J. R

    BHP-Utah Coal Limited's Peak Downs Mine is located in Cen- tral Queensland, approximately 200 km south west of Mackay. The annual raw coal production of the mine is over 8 million tpa, requirin

    Jan 1, 1989

  • AUSIMM
    Woodlawn Mine - An Underground Operation Review

    Woodlawn Mines began underground operations in 1986. At the time of going underground it was envisaged that there would be no 'contract' payment to the underground employees. This was a re

    Jan 1, 1995

  • AUSIMM
    Moisture Reduction of Coal by Surface Chemical Phonemena

    By Membrey W. B, Partridge A. C

    Lower transportation costs, improved handling and better utilization efficiency are some of the reasons that make low moisture coal product desirable. There has been considerable interest in the de

    Jan 1, 1989

  • AUSIMM
    Economically Mineable Resource in an Underground Metalliferous Mine

    By Bell I. F

    In 1985, ZC Mines (now Pasminco South) had been unprofitable for some years due to a combination of high operating costs, low metal prices, low head grade and an aging and inadequate mining infrastr

    Jan 1, 1992

  • AUSIMM
    Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin Smelters

    By Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J

    Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its

    Jan 1, 1984

  • AUSIMM
    Geology of the Leigh Creek Coalfield

    By Townsend IJ

    The Upper Triassic Leigh Creek Coal Measures which include a number of seams of sub-bituminous black coal are preserved in four small intramontane basins. The largest is Telford Basin, 1,000 m in

    Jan 1, 1975